MapReduce集群在Deadline约束下如何平衡系统利用率和数据局部性

Yeh-Cheng Chen, J. Chou
{"title":"MapReduce集群在Deadline约束下如何平衡系统利用率和数据局部性","authors":"Yeh-Cheng Chen, J. Chou","doi":"10.1109/PDCAT.2017.00061","DOIUrl":null,"url":null,"abstract":"MapReduce paradigm has become a popular platform for massive data processing and Big Data applications. Although MapReduce was initially designed for high throughput and batch processing, it has also been used for handling many other types of applications and workloads due to its scalable and reliable system architecture. One of the emerging requirements for enterprise data-process computing is completion time guar- antee. However, there are only a few research works have been done for MapReduce jobs with deadline constraint. Therefore, in this paper, we aim to prevent jobs from missing deadline while maximizing the resource utilization and data locality of a MapReduce cluster. Our approach is to introduce a two-phase job scheduling mechanism which combines a job admission controller policy and a priority-based scheduling algorithm. We use a series of simulations over diverted workload to evaluate our system. The results show that our approach can guarantee job completion time in a heavy-loaded system, and achieve comparable data locality to the delay schedule algorithm in a light-loaded system. Furthermore, our approach can maximize system throughput by preventing system resources from being wasted by the jobs missing their deadlines.","PeriodicalId":119197,"journal":{"name":"2017 18th International Conference on Parallel and Distributed Computing, Applications and Technologies (PDCAT)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Strike the Balance between System Utilization and Data Locality under Deadline Constraint for MapReduce Clusters\",\"authors\":\"Yeh-Cheng Chen, J. Chou\",\"doi\":\"10.1109/PDCAT.2017.00061\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"MapReduce paradigm has become a popular platform for massive data processing and Big Data applications. Although MapReduce was initially designed for high throughput and batch processing, it has also been used for handling many other types of applications and workloads due to its scalable and reliable system architecture. One of the emerging requirements for enterprise data-process computing is completion time guar- antee. However, there are only a few research works have been done for MapReduce jobs with deadline constraint. Therefore, in this paper, we aim to prevent jobs from missing deadline while maximizing the resource utilization and data locality of a MapReduce cluster. Our approach is to introduce a two-phase job scheduling mechanism which combines a job admission controller policy and a priority-based scheduling algorithm. We use a series of simulations over diverted workload to evaluate our system. The results show that our approach can guarantee job completion time in a heavy-loaded system, and achieve comparable data locality to the delay schedule algorithm in a light-loaded system. Furthermore, our approach can maximize system throughput by preventing system resources from being wasted by the jobs missing their deadlines.\",\"PeriodicalId\":119197,\"journal\":{\"name\":\"2017 18th International Conference on Parallel and Distributed Computing, Applications and Technologies (PDCAT)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 18th International Conference on Parallel and Distributed Computing, Applications and Technologies (PDCAT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PDCAT.2017.00061\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 18th International Conference on Parallel and Distributed Computing, Applications and Technologies (PDCAT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PDCAT.2017.00061","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

MapReduce范式已经成为海量数据处理和大数据应用的流行平台。虽然MapReduce最初是为高吞吐量和批处理而设计的,但由于其可扩展和可靠的系统架构,它也被用于处理许多其他类型的应用程序和工作负载。完成时间保证是企业数据处理计算的新需求之一。然而,对于有期限约束的MapReduce作业,研究工作很少。因此,在本文中,我们的目标是在最大限度地提高MapReduce集群的资源利用率和数据局部性的同时,防止作业错过截止日期。我们的方法是引入一种两阶段作业调度机制,该机制结合了作业接纳控制器策略和基于优先级的调度算法。我们在转移的工作负载上使用一系列模拟来评估我们的系统。结果表明,该方法在重载系统中可以保证作业完成时间,在轻负载系统中可以达到与延迟调度算法相当的数据局部性。此外,我们的方法可以通过防止作业错过截止日期而浪费系统资源来最大化系统吞吐量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Strike the Balance between System Utilization and Data Locality under Deadline Constraint for MapReduce Clusters
MapReduce paradigm has become a popular platform for massive data processing and Big Data applications. Although MapReduce was initially designed for high throughput and batch processing, it has also been used for handling many other types of applications and workloads due to its scalable and reliable system architecture. One of the emerging requirements for enterprise data-process computing is completion time guar- antee. However, there are only a few research works have been done for MapReduce jobs with deadline constraint. Therefore, in this paper, we aim to prevent jobs from missing deadline while maximizing the resource utilization and data locality of a MapReduce cluster. Our approach is to introduce a two-phase job scheduling mechanism which combines a job admission controller policy and a priority-based scheduling algorithm. We use a series of simulations over diverted workload to evaluate our system. The results show that our approach can guarantee job completion time in a heavy-loaded system, and achieve comparable data locality to the delay schedule algorithm in a light-loaded system. Furthermore, our approach can maximize system throughput by preventing system resources from being wasted by the jobs missing their deadlines.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信