考虑资金时间价值的PAAA算法在项目进度中的网络综合优化

Yuansheng Huang, Qingchao Liu, Zilong Qiu
{"title":"考虑资金时间价值的PAAA算法在项目进度中的网络综合优化","authors":"Yuansheng Huang, Qingchao Liu, Zilong Qiu","doi":"10.1109/CCCM.2008.52","DOIUrl":null,"url":null,"abstract":"From the view of how to get the biggest benefits by optimizing the project network schedule, the paper uses systemic method of controlling the construction schedule and puts forward a mathematical model which considers the synthetic optimization of the cost, the supply of resources and the influence of latent uncertainties. Then by changing the choose strategy and the local search strategy, the combining ant colony algorithms and particle swarm optimization algorithms (PAAA) is proposed and applied in the process of optimizing the model. Finally, an example is used to prove the method is effective.","PeriodicalId":326534,"journal":{"name":"2008 ISECS International Colloquium on Computing, Communication, Control, and Management","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-08-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Network Synthetic Optimization in Project Schedule by Using PAAA Algorithm and Considered of Time Value of Money\",\"authors\":\"Yuansheng Huang, Qingchao Liu, Zilong Qiu\",\"doi\":\"10.1109/CCCM.2008.52\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"From the view of how to get the biggest benefits by optimizing the project network schedule, the paper uses systemic method of controlling the construction schedule and puts forward a mathematical model which considers the synthetic optimization of the cost, the supply of resources and the influence of latent uncertainties. Then by changing the choose strategy and the local search strategy, the combining ant colony algorithms and particle swarm optimization algorithms (PAAA) is proposed and applied in the process of optimizing the model. Finally, an example is used to prove the method is effective.\",\"PeriodicalId\":326534,\"journal\":{\"name\":\"2008 ISECS International Colloquium on Computing, Communication, Control, and Management\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-08-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 ISECS International Colloquium on Computing, Communication, Control, and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CCCM.2008.52\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 ISECS International Colloquium on Computing, Communication, Control, and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CCCM.2008.52","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文从如何通过优化工程网络进度获得最大效益的角度出发,采用系统的方法对施工进度进行控制,提出了考虑成本、资源供给和潜在不确定性影响的综合优化数学模型。然后通过改变选择策略和局部搜索策略,提出了蚁群算法与粒子群优化算法(PAAA)相结合的方法,并将其应用于模型优化过程中。最后通过算例验证了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Network Synthetic Optimization in Project Schedule by Using PAAA Algorithm and Considered of Time Value of Money
From the view of how to get the biggest benefits by optimizing the project network schedule, the paper uses systemic method of controlling the construction schedule and puts forward a mathematical model which considers the synthetic optimization of the cost, the supply of resources and the influence of latent uncertainties. Then by changing the choose strategy and the local search strategy, the combining ant colony algorithms and particle swarm optimization algorithms (PAAA) is proposed and applied in the process of optimizing the model. Finally, an example is used to prove the method is effective.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信