东威尔枢纽重访

S. van der Loo, S. Proost
{"title":"东威尔枢纽重访","authors":"S. van der Loo, S. Proost","doi":"10.2139/ssrn.1571122","DOIUrl":null,"url":null,"abstract":"This paper assesses the Oosterweel junction, a new tunnel under the river Scheldt, that aims to alleviate the congestion on the existing tunnels and on the Ring of Antwerp. The paper uses data from existing studies of the same project to calibrate a simple network model (MOLINO-II). The model is then used to compare alternatives with and without the new tunnel. The alternatives include different combinations of tolls and bans on trucks. The study concludes that the first priority is not to build new capacity but to remove the pricing distortions on the existing capacity. The alternatives that include a pricing reform are the only ones that generate a positive net benefit, almost all scenarios that include the new tunnel have a negative net benefit.","PeriodicalId":410291,"journal":{"name":"ERN: Analytical Models (Topic)","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Oosterweel Junction Revisited\",\"authors\":\"S. van der Loo, S. Proost\",\"doi\":\"10.2139/ssrn.1571122\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper assesses the Oosterweel junction, a new tunnel under the river Scheldt, that aims to alleviate the congestion on the existing tunnels and on the Ring of Antwerp. The paper uses data from existing studies of the same project to calibrate a simple network model (MOLINO-II). The model is then used to compare alternatives with and without the new tunnel. The alternatives include different combinations of tolls and bans on trucks. The study concludes that the first priority is not to build new capacity but to remove the pricing distortions on the existing capacity. The alternatives that include a pricing reform are the only ones that generate a positive net benefit, almost all scenarios that include the new tunnel have a negative net benefit.\",\"PeriodicalId\":410291,\"journal\":{\"name\":\"ERN: Analytical Models (Topic)\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ERN: Analytical Models (Topic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.1571122\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERN: Analytical Models (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.1571122","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文评估了Oosterweel枢纽,一个新的隧道在斯海尔德河下,旨在缓解现有隧道和安特卫普环上的拥堵。本文使用来自同一项目现有研究的数据来校准一个简单的网络模型(MOLINO-II)。然后用该模型来比较有和没有新隧道的备选方案。替代方案包括不同的通行费和卡车禁令组合。该研究的结论是,首要任务不是建立新的产能,而是消除现有产能的定价扭曲。包括价格改革在内的替代方案是唯一能产生正净效益的方案,几乎所有包括新隧道在内的方案都有负净效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Oosterweel Junction Revisited
This paper assesses the Oosterweel junction, a new tunnel under the river Scheldt, that aims to alleviate the congestion on the existing tunnels and on the Ring of Antwerp. The paper uses data from existing studies of the same project to calibrate a simple network model (MOLINO-II). The model is then used to compare alternatives with and without the new tunnel. The alternatives include different combinations of tolls and bans on trucks. The study concludes that the first priority is not to build new capacity but to remove the pricing distortions on the existing capacity. The alternatives that include a pricing reform are the only ones that generate a positive net benefit, almost all scenarios that include the new tunnel have a negative net benefit.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信