{"title":"为市政和家庭供电的农村电网功率因数水平下降的后果计算","authors":"M. Qawaqzeh, Olha Sotnik, O. Miroshnyk, S. Halko, Oleksii Sotnik, Yurii Khandola","doi":"10.1109/MEES58014.2022.10005736","DOIUrl":null,"url":null,"abstract":"Comparative calculations of the load of a power transformer with a capacity of 100 kV.A and the carrying capacity, voltage and losses of electricity on a power transmission line of 0.4 kV in the village of Lutovinovka of the Kozelshchansky district branch of Poltavaoblenergo are carried out, taking into account the reduced value of the power factor and without taking into account the power factor (the existing method of calculation power loss). The refined values of the power factor showed that when calculating the current and voltage losses in the line sections, the calculations will be underestimated compared to the existing losses.","PeriodicalId":244144,"journal":{"name":"2022 IEEE 4th International Conference on Modern Electrical and Energy System (MEES)","volume":"148 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Calculation of the Consequences of a Decrease in the Power Factor Level in Rural Electrical Networks Supplying Municipal and Household Electrical Consumers\",\"authors\":\"M. Qawaqzeh, Olha Sotnik, O. Miroshnyk, S. Halko, Oleksii Sotnik, Yurii Khandola\",\"doi\":\"10.1109/MEES58014.2022.10005736\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Comparative calculations of the load of a power transformer with a capacity of 100 kV.A and the carrying capacity, voltage and losses of electricity on a power transmission line of 0.4 kV in the village of Lutovinovka of the Kozelshchansky district branch of Poltavaoblenergo are carried out, taking into account the reduced value of the power factor and without taking into account the power factor (the existing method of calculation power loss). The refined values of the power factor showed that when calculating the current and voltage losses in the line sections, the calculations will be underestimated compared to the existing losses.\",\"PeriodicalId\":244144,\"journal\":{\"name\":\"2022 IEEE 4th International Conference on Modern Electrical and Energy System (MEES)\",\"volume\":\"148 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE 4th International Conference on Modern Electrical and Energy System (MEES)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MEES58014.2022.10005736\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE 4th International Conference on Modern Electrical and Energy System (MEES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MEES58014.2022.10005736","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

容量为100kv的电力变压器负荷的比较计算。A和Poltavaoblenergo Kozelshchansky地区分公司Lutovinovka村0.4 kV输电线路上的电力承载能力,电压和损耗进行了计算,考虑了功率因数的降低值,而不考虑功率因数(现有的计算功率损耗的方法)。细化后的功率因数值表明,在计算线段的电流和电压损耗时,与现有损耗相比,计算结果会被低估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Calculation of the Consequences of a Decrease in the Power Factor Level in Rural Electrical Networks Supplying Municipal and Household Electrical Consumers
Comparative calculations of the load of a power transformer with a capacity of 100 kV.A and the carrying capacity, voltage and losses of electricity on a power transmission line of 0.4 kV in the village of Lutovinovka of the Kozelshchansky district branch of Poltavaoblenergo are carried out, taking into account the reduced value of the power factor and without taking into account the power factor (the existing method of calculation power loss). The refined values of the power factor showed that when calculating the current and voltage losses in the line sections, the calculations will be underestimated compared to the existing losses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信