Yu. V. Gorbenko, A. Vasil’ev, G. A. Sudol’skii, G. Tregub, I. Shatalina, A. M. Shvainshtein
{"title":"布里亚水利枢纽通水结构及其在首台水力发电机组启动前施工阶段的科学验证","authors":"Yu. V. Gorbenko, A. Vasil’ev, G. A. Sudol’skii, G. Tregub, I. Shatalina, A. M. Shvainshtein","doi":"10.1023/A:1014378110175","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":430380,"journal":{"name":"Hydrotechnical Construction","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Water-Passing Structures of the Bureya Hydroproject and Their Scientific Validation in the Construction Stage Prior to Startup of the First Hydraulic Generating Sets\",\"authors\":\"Yu. V. Gorbenko, A. Vasil’ev, G. A. Sudol’skii, G. Tregub, I. Shatalina, A. M. Shvainshtein\",\"doi\":\"10.1023/A:1014378110175\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":430380,\"journal\":{\"name\":\"Hydrotechnical Construction\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Hydrotechnical Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1023/A:1014378110175\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydrotechnical Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1023/A:1014378110175","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Water-Passing Structures of the Bureya Hydroproject and Their Scientific Validation in the Construction Stage Prior to Startup of the First Hydraulic Generating Sets