危机情况下关键基础设施供电方法研究

M. Čerňan, Z. Müller, J. Tlustý, Jiří Halaška
{"title":"危机情况下关键基础设施供电方法研究","authors":"M. Čerňan, Z. Müller, J. Tlustý, Jiří Halaška","doi":"10.1109/EPE51172.2020.9269257","DOIUrl":null,"url":null,"abstract":"The paper focuses on the issues associated with the supply of electricity to critical infrastructure in crisis situations. In the introductory passages, the paper focuses on the methodology of selecting objects of critical infrastructure. Subsequently, attention is paid to selected aspects associated with the operation of electricity generation during a crisis situations. By using suitable types of production units (gas turbines), it is possible to gradually start island operation in the surrounding region, primarily for critical infrastructure facilities, whose main task is to protect the population. In the practical part, the paper focuses on the issues of stability of the island operation mode. The results of the case study show that for the switch-on plan it is necessary to take into account the dynamic characteristics of island operation by feeding the objects of critical infrastructure gradually after small electrical power steps.","PeriodicalId":177031,"journal":{"name":"2020 21st International Scientific Conference on Electric Power Engineering (EPE)","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Methodology of Electricity Supplying of Critical Infrastructure in Crisis Situations\",\"authors\":\"M. Čerňan, Z. Müller, J. Tlustý, Jiří Halaška\",\"doi\":\"10.1109/EPE51172.2020.9269257\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper focuses on the issues associated with the supply of electricity to critical infrastructure in crisis situations. In the introductory passages, the paper focuses on the methodology of selecting objects of critical infrastructure. Subsequently, attention is paid to selected aspects associated with the operation of electricity generation during a crisis situations. By using suitable types of production units (gas turbines), it is possible to gradually start island operation in the surrounding region, primarily for critical infrastructure facilities, whose main task is to protect the population. In the practical part, the paper focuses on the issues of stability of the island operation mode. The results of the case study show that for the switch-on plan it is necessary to take into account the dynamic characteristics of island operation by feeding the objects of critical infrastructure gradually after small electrical power steps.\",\"PeriodicalId\":177031,\"journal\":{\"name\":\"2020 21st International Scientific Conference on Electric Power Engineering (EPE)\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 21st International Scientific Conference on Electric Power Engineering (EPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPE51172.2020.9269257\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 21st International Scientific Conference on Electric Power Engineering (EPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPE51172.2020.9269257","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文的重点是与危机情况下关键基础设施的电力供应相关的问题。在引言部分,本文重点介绍了关键基础设施项目选择的方法。随后,关注与危机情况下发电运行有关的选定方面。通过使用适当类型的生产装置(燃气轮机),可以在周围区域逐步开始岛屿作业,主要用于关键的基础设施,其主要任务是保护人口。在实践部分,本文重点研究了海岛运营模式的稳定性问题。实例研究结果表明,在开闸方案中,应考虑海岛运行的动态特性,在小功率步长后逐步给关键基础设施对象供电。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Methodology of Electricity Supplying of Critical Infrastructure in Crisis Situations
The paper focuses on the issues associated with the supply of electricity to critical infrastructure in crisis situations. In the introductory passages, the paper focuses on the methodology of selecting objects of critical infrastructure. Subsequently, attention is paid to selected aspects associated with the operation of electricity generation during a crisis situations. By using suitable types of production units (gas turbines), it is possible to gradually start island operation in the surrounding region, primarily for critical infrastructure facilities, whose main task is to protect the population. In the practical part, the paper focuses on the issues of stability of the island operation mode. The results of the case study show that for the switch-on plan it is necessary to take into account the dynamic characteristics of island operation by feeding the objects of critical infrastructure gradually after small electrical power steps.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信