{"title":"高层建筑屋面施工预算超支的原因分析","authors":"R. Andriani, B. Susetyo","doi":"10.31695/ijerat.2019.3434","DOIUrl":null,"url":null,"abstract":"ABSTRACT The development of building construction in Indonesia is experiencing rapid development. In 2018, the total construction projects are predicted to increase by 3% compared to 2017. The concept of building high-rise buildings now uses the concept of green building. Where in the use of materials must be according to the approval of a green building consultant. This study uses roof covering material with solar panels, using these materials project planning becomes overbudget. Overbudget that occurs when planning with the green building concept is 15% of the initial contract. Therefore, the researcher will discuss the factors that influence the cost efficiency of the roof cover work of high-rise buildings. Processing data using SPSS tools (Statistical Package for Social Sciences). From this data processor with SPSS, there were 10 factors that caused the overbudget of roof cover work on the construction of high-rise buildings using wrong estimation techniques, complicated development requirements, inadequate project funding, not taking into account unexpected costs, inaccurate estimation of costs, data and incomplete project information, material selection according to work drawings, owner changes to design changes when construction is underway, lack of coordination between construction manager planner and estimated cost of building high-rise buildings. For this reason, look for factors that cause roof cover work in the construction of high-rise buildings.","PeriodicalId":424923,"journal":{"name":"International Journal of Engineering Research and Advanced Technology","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Factors Causing Overbudget for Roof Cover Work in the Construction of High-rise Buildings\",\"authors\":\"R. Andriani, B. Susetyo\",\"doi\":\"10.31695/ijerat.2019.3434\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The development of building construction in Indonesia is experiencing rapid development. In 2018, the total construction projects are predicted to increase by 3% compared to 2017. The concept of building high-rise buildings now uses the concept of green building. Where in the use of materials must be according to the approval of a green building consultant. This study uses roof covering material with solar panels, using these materials project planning becomes overbudget. Overbudget that occurs when planning with the green building concept is 15% of the initial contract. Therefore, the researcher will discuss the factors that influence the cost efficiency of the roof cover work of high-rise buildings. Processing data using SPSS tools (Statistical Package for Social Sciences). From this data processor with SPSS, there were 10 factors that caused the overbudget of roof cover work on the construction of high-rise buildings using wrong estimation techniques, complicated development requirements, inadequate project funding, not taking into account unexpected costs, inaccurate estimation of costs, data and incomplete project information, material selection according to work drawings, owner changes to design changes when construction is underway, lack of coordination between construction manager planner and estimated cost of building high-rise buildings. For this reason, look for factors that cause roof cover work in the construction of high-rise buildings.\",\"PeriodicalId\":424923,\"journal\":{\"name\":\"International Journal of Engineering Research and Advanced Technology\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Engineering Research and Advanced Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31695/ijerat.2019.3434\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Research and Advanced Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31695/ijerat.2019.3434","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
印度尼西亚的建筑建设发展迅速。2018年,预计总建设项目将比2017年增加3%。现在建造高层建筑的概念采用了绿色建筑的概念。凡在使用的材料必须经绿色建筑顾问批准。本研究使用屋顶覆盖材料与太阳能电池板,使用这些材料的项目规划成为超支。绿色建筑概念规划时出现的预算超支是初始合同的15%。因此,研究人员将讨论影响高层建筑屋面工作成本效益的因素。使用SPSS工具(Statistical Package for Social Sciences)处理数据。从SPSS数据处理器中,有10个因素导致高层建筑屋顶覆盖工作预算超支,使用错误的估算技术,复杂的开发需求,项目资金不足,未考虑意外成本,成本估算不准确,数据和项目信息不完整,根据工作图纸选择材料,业主变更设计变更施工进行中,高层建筑施工管理者、规划人员与造价估算之间缺乏协调。因此,在高层建筑的施工中寻找导致屋顶覆盖工作的因素。
Factors Causing Overbudget for Roof Cover Work in the Construction of High-rise Buildings
ABSTRACT The development of building construction in Indonesia is experiencing rapid development. In 2018, the total construction projects are predicted to increase by 3% compared to 2017. The concept of building high-rise buildings now uses the concept of green building. Where in the use of materials must be according to the approval of a green building consultant. This study uses roof covering material with solar panels, using these materials project planning becomes overbudget. Overbudget that occurs when planning with the green building concept is 15% of the initial contract. Therefore, the researcher will discuss the factors that influence the cost efficiency of the roof cover work of high-rise buildings. Processing data using SPSS tools (Statistical Package for Social Sciences). From this data processor with SPSS, there were 10 factors that caused the overbudget of roof cover work on the construction of high-rise buildings using wrong estimation techniques, complicated development requirements, inadequate project funding, not taking into account unexpected costs, inaccurate estimation of costs, data and incomplete project information, material selection according to work drawings, owner changes to design changes when construction is underway, lack of coordination between construction manager planner and estimated cost of building high-rise buildings. For this reason, look for factors that cause roof cover work in the construction of high-rise buildings.