JFPSO与分布式发电机组连接的配电系统损耗最小化

R. Eiada, E. Badran
{"title":"JFPSO与分布式发电机组连接的配电系统损耗最小化","authors":"R. Eiada, E. Badran","doi":"10.1109/MEPCON55441.2022.10021746","DOIUrl":null,"url":null,"abstract":"The employment of DG in a distribution system is fraught with difficulties. The appropriate location and DG rating selection can help to reduce the system losses and cost. Many strategies for solving and optimizing the DG location and rating were provided in previous courses. By maximizing the goal functions, the ideal places and sizes to connect several DG units can be discovered. In this study, a proposed strategy for minimizing loss and cost, which incorporates the cost of system losses with DG, is described. The suggested approach is based on using jumping frogs for particle swarm optimization (JFPSO). This method depends on a thorough examination of the precise loss formula as well as continuous power flow in the distribution system. Additionally, analysis techniques are used to calculate power loss and the voltage buses with the lowest strength. The best-distributed generation size is then found. It utilizes the IEEE 30-bus system by the suggested strategy.","PeriodicalId":174878,"journal":{"name":"2022 23rd International Middle East Power Systems Conference (MEPCON)","volume":"87 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Minimization Losses of Distribution Systems connected with Distributed Generation Units using JFPSO\",\"authors\":\"R. Eiada, E. Badran\",\"doi\":\"10.1109/MEPCON55441.2022.10021746\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The employment of DG in a distribution system is fraught with difficulties. The appropriate location and DG rating selection can help to reduce the system losses and cost. Many strategies for solving and optimizing the DG location and rating were provided in previous courses. By maximizing the goal functions, the ideal places and sizes to connect several DG units can be discovered. In this study, a proposed strategy for minimizing loss and cost, which incorporates the cost of system losses with DG, is described. The suggested approach is based on using jumping frogs for particle swarm optimization (JFPSO). This method depends on a thorough examination of the precise loss formula as well as continuous power flow in the distribution system. Additionally, analysis techniques are used to calculate power loss and the voltage buses with the lowest strength. The best-distributed generation size is then found. It utilizes the IEEE 30-bus system by the suggested strategy.\",\"PeriodicalId\":174878,\"journal\":{\"name\":\"2022 23rd International Middle East Power Systems Conference (MEPCON)\",\"volume\":\"87 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 23rd International Middle East Power Systems Conference (MEPCON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MEPCON55441.2022.10021746\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 23rd International Middle East Power Systems Conference (MEPCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MEPCON55441.2022.10021746","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

DG在配电系统中的应用充满了困难。选择合适的位置和DG额定值可以帮助减少系统损耗和成本。在之前的课程中提供了许多求解和优化DG位置和评级的策略。通过最大化目标函数,可以找到连接多个DG单元的理想位置和大小。在本研究中,提出了一种最小化损失和成本的策略,该策略将系统损失的成本与DG相结合。该方法基于跳蛙粒子群优化(JFPSO)。这种方法依赖于对精确的损耗公式和配电系统中连续的潮流进行彻底的检查。此外,分析技术用于计算功率损耗和最低强度的电压总线。然后找到最佳分布的发电规模。该方案利用了IEEE 30总线系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Minimization Losses of Distribution Systems connected with Distributed Generation Units using JFPSO
The employment of DG in a distribution system is fraught with difficulties. The appropriate location and DG rating selection can help to reduce the system losses and cost. Many strategies for solving and optimizing the DG location and rating were provided in previous courses. By maximizing the goal functions, the ideal places and sizes to connect several DG units can be discovered. In this study, a proposed strategy for minimizing loss and cost, which incorporates the cost of system losses with DG, is described. The suggested approach is based on using jumping frogs for particle swarm optimization (JFPSO). This method depends on a thorough examination of the precise loss formula as well as continuous power flow in the distribution system. Additionally, analysis techniques are used to calculate power loss and the voltage buses with the lowest strength. The best-distributed generation size is then found. It utilizes the IEEE 30-bus system by the suggested strategy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信