{"title":"阿萨布兰卡海上风电场项目-主要技术方面","authors":"A. Wey","doi":"10.4043/29838-ms","DOIUrl":null,"url":null,"abstract":"\n The plans to develop the ASA BRANCA OFFSHORE WINDPOWER PROJECT were envisioned a long time ago, by 2001, after a great drought in Brazil, as reported in the Historical Scenario of this article, aiming at providing the National Grid with larger clean energy sources by means of offshore wind power plants. Its initial phase shall start by 2025 with 720 MW of installed capacity on the Brazilian Northeast coast. Today, it represents a challenging project since its implementation will be the largest pioneer offshore generation not only in Brazil, but also in the southern hemisphere at the tropical environment near the equator. The feasibility studies indicate the higher capacity factor of this Project that accrues from the known trade winds on this region blowing steadily toward the equator from the southeast.\n The Project presented herein shall be the first phase of a much larger Offshore Wind Farm development that EÓLICA BRASIL has defined and presented to the Brazilian Authorities. This Phase-I has received permits to be installed at the sea near shore in the Municipality of Amontada, in an area that spans 15 km along the coast of Ceará State and at about 9 to 18 km distance of from the seashore.\n In this region, there are more than 6 GW of onshore wind power plants installed or planed along the coasts of the Northeast Region at Ceará and Rio Grande do Norte States, distributed in hundreds of small and medium onshore generations very near the seashore. The successful operational experience of those projects is a significant indication of the unexplored offshore windpower potential available on this Brazilian coastal region, so that it is included among the most promising regions in the world to produce bulk clean power, especially considering huge offshore windpower plants that will certainly be one of the main Brazilian contributions to reduce the risks from global warming. World's biggest companies, from hi-tech firms to large banks, are bracing for prospect that climate change could substantially affect their bottom lines yet within the next decade due to impacts that will be faced as the planet warms. Early estimates suggest that trillions of dollars may ultimately be at stake.\n The development of such enormous offshore potential of renewable energy, assured by existing both Brazilian legislation and official regulations, became technical and economic feasible in Brazil by applying the new conception of offshore wind turbine generators (WTGs) with unit ratings larger than 10 MW propelled by wind speeds faster than 10m/sec.\n This paper presents the main technical characteristics of the conceptual design of this pioneer Project in Brazil, including the basics of planning and feasibility studies as well as the foreseen scenarios for national power market for offshore wind generation on the horizon of the next decade (2021-2030).","PeriodicalId":415055,"journal":{"name":"Day 1 Tue, October 29, 2019","volume":"258 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Asa Branca Offshore Wind Farm Project – Main Technical Aspects\",\"authors\":\"A. Wey\",\"doi\":\"10.4043/29838-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The plans to develop the ASA BRANCA OFFSHORE WINDPOWER PROJECT were envisioned a long time ago, by 2001, after a great drought in Brazil, as reported in the Historical Scenario of this article, aiming at providing the National Grid with larger clean energy sources by means of offshore wind power plants. Its initial phase shall start by 2025 with 720 MW of installed capacity on the Brazilian Northeast coast. Today, it represents a challenging project since its implementation will be the largest pioneer offshore generation not only in Brazil, but also in the southern hemisphere at the tropical environment near the equator. The feasibility studies indicate the higher capacity factor of this Project that accrues from the known trade winds on this region blowing steadily toward the equator from the southeast.\\n The Project presented herein shall be the first phase of a much larger Offshore Wind Farm development that EÓLICA BRASIL has defined and presented to the Brazilian Authorities. This Phase-I has received permits to be installed at the sea near shore in the Municipality of Amontada, in an area that spans 15 km along the coast of Ceará State and at about 9 to 18 km distance of from the seashore.\\n In this region, there are more than 6 GW of onshore wind power plants installed or planed along the coasts of the Northeast Region at Ceará and Rio Grande do Norte States, distributed in hundreds of small and medium onshore generations very near the seashore. The successful operational experience of those projects is a significant indication of the unexplored offshore windpower potential available on this Brazilian coastal region, so that it is included among the most promising regions in the world to produce bulk clean power, especially considering huge offshore windpower plants that will certainly be one of the main Brazilian contributions to reduce the risks from global warming. World's biggest companies, from hi-tech firms to large banks, are bracing for prospect that climate change could substantially affect their bottom lines yet within the next decade due to impacts that will be faced as the planet warms. Early estimates suggest that trillions of dollars may ultimately be at stake.\\n The development of such enormous offshore potential of renewable energy, assured by existing both Brazilian legislation and official regulations, became technical and economic feasible in Brazil by applying the new conception of offshore wind turbine generators (WTGs) with unit ratings larger than 10 MW propelled by wind speeds faster than 10m/sec.\\n This paper presents the main technical characteristics of the conceptual design of this pioneer Project in Brazil, including the basics of planning and feasibility studies as well as the foreseen scenarios for national power market for offshore wind generation on the horizon of the next decade (2021-2030).\",\"PeriodicalId\":415055,\"journal\":{\"name\":\"Day 1 Tue, October 29, 2019\",\"volume\":\"258 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Tue, October 29, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/29838-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, October 29, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/29838-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

ASA BRANCA海上风电项目的开发计划在很久以前就有了设想,在2001年,在巴西发生了一场大干旱之后,正如本文的历史情景所报道的那样,旨在通过海上风力发电厂为国家电网提供更大的清洁能源。其初始阶段将于2025年开始,在巴西东北海岸安装720兆瓦的装机容量。今天,它代表了一个具有挑战性的项目,因为它的实施不仅是巴西最大的海上发电先锋,也是南半球赤道附近热带环境中最大的海上发电先锋。可行性研究表明,该地区已知的信风从东南方向稳定吹向赤道,使该项目具有较高的容量系数。此处介绍的项目将是一个更大的海上风电场开发的第一阶段,EÓLICA BRASIL已经定义并提交给巴西当局。第一阶段已获得许可,将安装在阿蒙塔达市靠近海岸的海上,该地区沿塞埃尔州海岸15公里,距离海岸约9至18公里。在该地区,沿东北地区ceear和里约热内卢格兰德州海岸安装或规划的陆上风力发电厂超过6吉瓦,分布在非常靠近海岸的数百个中小型陆上世代。这些项目的成功运营经验是巴西沿海地区未开发的海上风电潜力的重要标志,因此它被列入世界上最有希望生产大量清洁能源的地区之一,特别是考虑到巨大的海上风力发电厂肯定会成为巴西减少全球变暖风险的主要贡献之一。世界上最大的公司,从高科技公司到大型银行,都在为气候变化可能在未来十年内严重影响其底线的前景做准备,因为地球变暖将带来影响。初步估计表明,数万亿美元最终可能处于危险之中。在巴西现有的立法和官方法规的保障下,这种巨大的海上可再生能源潜力的发展,在巴西通过应用海上风力涡轮发电机(WTGs)的新概念,在风速超过10米/秒的情况下,机组额定功率大于10兆瓦,在技术和经济上都是可行的。本文介绍了巴西这一先锋项目概念设计的主要技术特点,包括规划和可行性研究的基础知识,以及未来十年(2021-2030年)海上风电国家电力市场的可预见情景。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Asa Branca Offshore Wind Farm Project – Main Technical Aspects
The plans to develop the ASA BRANCA OFFSHORE WINDPOWER PROJECT were envisioned a long time ago, by 2001, after a great drought in Brazil, as reported in the Historical Scenario of this article, aiming at providing the National Grid with larger clean energy sources by means of offshore wind power plants. Its initial phase shall start by 2025 with 720 MW of installed capacity on the Brazilian Northeast coast. Today, it represents a challenging project since its implementation will be the largest pioneer offshore generation not only in Brazil, but also in the southern hemisphere at the tropical environment near the equator. The feasibility studies indicate the higher capacity factor of this Project that accrues from the known trade winds on this region blowing steadily toward the equator from the southeast. The Project presented herein shall be the first phase of a much larger Offshore Wind Farm development that EÓLICA BRASIL has defined and presented to the Brazilian Authorities. This Phase-I has received permits to be installed at the sea near shore in the Municipality of Amontada, in an area that spans 15 km along the coast of Ceará State and at about 9 to 18 km distance of from the seashore. In this region, there are more than 6 GW of onshore wind power plants installed or planed along the coasts of the Northeast Region at Ceará and Rio Grande do Norte States, distributed in hundreds of small and medium onshore generations very near the seashore. The successful operational experience of those projects is a significant indication of the unexplored offshore windpower potential available on this Brazilian coastal region, so that it is included among the most promising regions in the world to produce bulk clean power, especially considering huge offshore windpower plants that will certainly be one of the main Brazilian contributions to reduce the risks from global warming. World's biggest companies, from hi-tech firms to large banks, are bracing for prospect that climate change could substantially affect their bottom lines yet within the next decade due to impacts that will be faced as the planet warms. Early estimates suggest that trillions of dollars may ultimately be at stake. The development of such enormous offshore potential of renewable energy, assured by existing both Brazilian legislation and official regulations, became technical and economic feasible in Brazil by applying the new conception of offshore wind turbine generators (WTGs) with unit ratings larger than 10 MW propelled by wind speeds faster than 10m/sec. This paper presents the main technical characteristics of the conceptual design of this pioneer Project in Brazil, including the basics of planning and feasibility studies as well as the foreseen scenarios for national power market for offshore wind generation on the horizon of the next decade (2021-2030).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信