{"title":"更努力更聪明","authors":"Peter Jones","doi":"10.1049/PE:20070106","DOIUrl":null,"url":null,"abstract":"This paper discusses how FACTS (flexible AC transmission system) and WAMS (wide area monitoring systems) technologies can help the UK to meet the challenge of connecting renewable generation. This is achieved by constructing the necessary grid reinforcements while getting more out of its current transmission network. However, the growth in renewable poses new challenges for the UK transmission network, particularly in Scotland. Transmission system reinforcements, which are necessary to carry the very large amounts of additional power generated by wind and marine from the more remote parts of the UK, may potentially be delayed by lengthy public enquiries. FACTS and WAMS technology could allow a flexible upgrade path for the existing transmission network, enabling it to work harder and smarter, while allowing time for the construction of necessary transmission reinforcement and help make the achievement of the UK Government 2010 Renewable Energy Targets more likely.","PeriodicalId":182274,"journal":{"name":"Power Engineer","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Harder and Smarter\",\"authors\":\"Peter Jones\",\"doi\":\"10.1049/PE:20070106\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper discusses how FACTS (flexible AC transmission system) and WAMS (wide area monitoring systems) technologies can help the UK to meet the challenge of connecting renewable generation. This is achieved by constructing the necessary grid reinforcements while getting more out of its current transmission network. However, the growth in renewable poses new challenges for the UK transmission network, particularly in Scotland. Transmission system reinforcements, which are necessary to carry the very large amounts of additional power generated by wind and marine from the more remote parts of the UK, may potentially be delayed by lengthy public enquiries. FACTS and WAMS technology could allow a flexible upgrade path for the existing transmission network, enabling it to work harder and smarter, while allowing time for the construction of necessary transmission reinforcement and help make the achievement of the UK Government 2010 Renewable Energy Targets more likely.\",\"PeriodicalId\":182274,\"journal\":{\"name\":\"Power Engineer\",\"volume\":\"58 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Power Engineer\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1049/PE:20070106\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power Engineer","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/PE:20070106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

本文讨论了FACTS(柔性交流输电系统)和WAMS(广域监测系统)技术如何帮助英国应对连接可再生能源发电的挑战。这是通过建设必要的电网加固来实现的,同时从目前的输电网络中获得更多。然而,可再生能源的增长给英国的输电网络带来了新的挑战,特别是在苏格兰。输电系统的加强是必要的,它可以从英国更偏远的地区运送大量由风力和海洋产生的额外电力,可能会因冗长的公众查询而被推迟。FACTS和WAMS技术可以为现有输电网络提供灵活的升级路径,使其工作更努力、更智能,同时为建设必要的输电加固提供时间,并有助于实现英国政府2010年可再生能源目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Harder and Smarter
This paper discusses how FACTS (flexible AC transmission system) and WAMS (wide area monitoring systems) technologies can help the UK to meet the challenge of connecting renewable generation. This is achieved by constructing the necessary grid reinforcements while getting more out of its current transmission network. However, the growth in renewable poses new challenges for the UK transmission network, particularly in Scotland. Transmission system reinforcements, which are necessary to carry the very large amounts of additional power generated by wind and marine from the more remote parts of the UK, may potentially be delayed by lengthy public enquiries. FACTS and WAMS technology could allow a flexible upgrade path for the existing transmission network, enabling it to work harder and smarter, while allowing time for the construction of necessary transmission reinforcement and help make the achievement of the UK Government 2010 Renewable Energy Targets more likely.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信