为最大限度地提高雅加达捷运二期列车的运营,哥打站牵引变电站的最大容量计算分析

Dian Samodrawati, Saddam Abdur Rahman
{"title":"为最大限度地提高雅加达捷运二期列车的运营,哥打站牵引变电站的最大容量计算分析","authors":"Dian Samodrawati, Saddam Abdur Rahman","doi":"10.54732/jeecs.v6i2.197","DOIUrl":null,"url":null,"abstract":"\n\n \n \n \n\n\n\n \n\n\nMRT Jakarta is one of the providers of rail transportation services in Jakarta, which is an absolute solution to the problem of congestion in Jakarta because mass transportation can transport people in large quantities in one trip so that by calculating the electrical power capacity to supply electricity to the MRT Jakarta train it is very important with the aim of predicting the pattern of train operation. This test includes calculating the use of traction substations with headway, namely 10, 7, 5, 3, and 1 minute, then the power usage of the train according to data from technical specifications and also required data on filling distances for Kota Station Traction Substations in Phase 2 construction documents, then an analysis is carried out for the ability of the traction substation that supplies train operators in Phase 2. After calculating and analyzing, concluded that under normal conditions the Kota Traction Substation can operate continuously with a headway operating pattern of 10, 7, 5, and 3 minutes, then in disturbance conditions, 1 TSS Off the Kota Traction Substation can operate continuously with an operating pattern. headway 10, 7, and 5 minutes, then in disturbance condition 2 TSS Off.\n\n\n","PeriodicalId":273708,"journal":{"name":"JEECS (Journal of Electrical Engineering and Computer Sciences)","volume":"301 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Maximum Capacity Calculation of Kota Station Traction Substations to Maximize MRT Jakarta Phase 2 Train Operations\",\"authors\":\"Dian Samodrawati, Saddam Abdur Rahman\",\"doi\":\"10.54732/jeecs.v6i2.197\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n\\n \\n \\n \\n\\n\\n\\n \\n\\n\\nMRT Jakarta is one of the providers of rail transportation services in Jakarta, which is an absolute solution to the problem of congestion in Jakarta because mass transportation can transport people in large quantities in one trip so that by calculating the electrical power capacity to supply electricity to the MRT Jakarta train it is very important with the aim of predicting the pattern of train operation. This test includes calculating the use of traction substations with headway, namely 10, 7, 5, 3, and 1 minute, then the power usage of the train according to data from technical specifications and also required data on filling distances for Kota Station Traction Substations in Phase 2 construction documents, then an analysis is carried out for the ability of the traction substation that supplies train operators in Phase 2. After calculating and analyzing, concluded that under normal conditions the Kota Traction Substation can operate continuously with a headway operating pattern of 10, 7, 5, and 3 minutes, then in disturbance conditions, 1 TSS Off the Kota Traction Substation can operate continuously with an operating pattern. headway 10, 7, and 5 minutes, then in disturbance condition 2 TSS Off.\\n\\n\\n\",\"PeriodicalId\":273708,\"journal\":{\"name\":\"JEECS (Journal of Electrical Engineering and Computer Sciences)\",\"volume\":\"301 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JEECS (Journal of Electrical Engineering and Computer Sciences)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54732/jeecs.v6i2.197\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JEECS (Journal of Electrical Engineering and Computer Sciences)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54732/jeecs.v6i2.197","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

雅加达捷运是雅加达轨道交通服务的供应商之一,这绝对是解决雅加达拥堵问题的办法,因为大众交通可以在一次行程中运送大量的人,因此通过计算雅加达捷运列车供电的电力容量,对于预测列车运行模式非常重要。该试验包括计算车头距为10、7、5、3和1分钟的牵引变电站的使用情况,然后根据技术规范的数据和第二期施工文件中要求的Kota站牵引变电站填充距离的数据计算列车的用电量,然后对第二期为列车操作员提供供电的牵引变电站的能力进行分析。经过计算分析,得出在正常情况下,Kota牵引变电所可以以10分钟、7分钟、5分钟和3分钟的时距运行模式连续运行,在扰动情况下,Kota牵引变电所可以以1分钟时距运行模式连续运行。前进10,7,5分钟,然后进入干扰状态2 TSS关闭。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Maximum Capacity Calculation of Kota Station Traction Substations to Maximize MRT Jakarta Phase 2 Train Operations
        MRT Jakarta is one of the providers of rail transportation services in Jakarta, which is an absolute solution to the problem of congestion in Jakarta because mass transportation can transport people in large quantities in one trip so that by calculating the electrical power capacity to supply electricity to the MRT Jakarta train it is very important with the aim of predicting the pattern of train operation. This test includes calculating the use of traction substations with headway, namely 10, 7, 5, 3, and 1 minute, then the power usage of the train according to data from technical specifications and also required data on filling distances for Kota Station Traction Substations in Phase 2 construction documents, then an analysis is carried out for the ability of the traction substation that supplies train operators in Phase 2. After calculating and analyzing, concluded that under normal conditions the Kota Traction Substation can operate continuously with a headway operating pattern of 10, 7, 5, and 3 minutes, then in disturbance conditions, 1 TSS Off the Kota Traction Substation can operate continuously with an operating pattern. headway 10, 7, and 5 minutes, then in disturbance condition 2 TSS Off.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信