{"title":"提高设备可靠性的功率暂降/浪涌测试","authors":"Ron Moser","doi":"10.1109/ISEMC.1982.7567732","DOIUrl":null,"url":null,"abstract":"The need for testing military and non-military subsystems for their ability to tolerate inevitable transient variations in the electrical bus voltage powering them is established. Various military and non-military standards defining AC and DC powerline sag and surge limits for durations greater than 1 millisecond are compared. Arguments are put forth for simulating such transient conditions in the EMC Test Laboratory, both during equipment development tests and as part of the equipment production qualification tests. Laboratory production of powerline sag and surge conditions is discussed, with a detailed compar ison of off-line power amplifiers and on-line thyristor controllers test equipments being made.","PeriodicalId":280076,"journal":{"name":"1982 IEEE International Symposium on Electromagnetic Compatibility","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1982-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Power Sag/Surge Testing for Equipment Reliability Improvement\",\"authors\":\"Ron Moser\",\"doi\":\"10.1109/ISEMC.1982.7567732\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The need for testing military and non-military subsystems for their ability to tolerate inevitable transient variations in the electrical bus voltage powering them is established. Various military and non-military standards defining AC and DC powerline sag and surge limits for durations greater than 1 millisecond are compared. Arguments are put forth for simulating such transient conditions in the EMC Test Laboratory, both during equipment development tests and as part of the equipment production qualification tests. Laboratory production of powerline sag and surge conditions is discussed, with a detailed compar ison of off-line power amplifiers and on-line thyristor controllers test equipments being made.\",\"PeriodicalId\":280076,\"journal\":{\"name\":\"1982 IEEE International Symposium on Electromagnetic Compatibility\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1982-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1982 IEEE International Symposium on Electromagnetic Compatibility\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISEMC.1982.7567732\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1982 IEEE International Symposium on Electromagnetic Compatibility","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISEMC.1982.7567732","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Power Sag/Surge Testing for Equipment Reliability Improvement
The need for testing military and non-military subsystems for their ability to tolerate inevitable transient variations in the electrical bus voltage powering them is established. Various military and non-military standards defining AC and DC powerline sag and surge limits for durations greater than 1 millisecond are compared. Arguments are put forth for simulating such transient conditions in the EMC Test Laboratory, both during equipment development tests and as part of the equipment production qualification tests. Laboratory production of powerline sag and surge conditions is discussed, with a detailed compar ison of off-line power amplifiers and on-line thyristor controllers test equipments being made.