提高设备可靠性的功率暂降/浪涌测试

Ron Moser
{"title":"提高设备可靠性的功率暂降/浪涌测试","authors":"Ron Moser","doi":"10.1109/ISEMC.1982.7567732","DOIUrl":null,"url":null,"abstract":"The need for testing military and non-military subsystems for their ability to tolerate inevitable transient variations in the electrical bus voltage powering them is established. Various military and non-military standards defining AC and DC powerline sag and surge limits for durations greater than 1 millisecond are compared. Arguments are put forth for simulating such transient conditions in the EMC Test Laboratory, both during equipment development tests and as part of the equipment production qualification tests. Laboratory production of powerline sag and surge conditions is discussed, with a detailed compar­ ison of off-line power amplifiers and on-line thyristor controllers test equipments being made.","PeriodicalId":280076,"journal":{"name":"1982 IEEE International Symposium on Electromagnetic Compatibility","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1982-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Power Sag/Surge Testing for Equipment Reliability Improvement\",\"authors\":\"Ron Moser\",\"doi\":\"10.1109/ISEMC.1982.7567732\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The need for testing military and non-military subsystems for their ability to tolerate inevitable transient variations in the electrical bus voltage powering them is established. Various military and non-military standards defining AC and DC powerline sag and surge limits for durations greater than 1 millisecond are compared. Arguments are put forth for simulating such transient conditions in the EMC Test Laboratory, both during equipment development tests and as part of the equipment production qualification tests. Laboratory production of powerline sag and surge conditions is discussed, with a detailed compar­ ison of off-line power amplifiers and on-line thyristor controllers test equipments being made.\",\"PeriodicalId\":280076,\"journal\":{\"name\":\"1982 IEEE International Symposium on Electromagnetic Compatibility\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1982-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1982 IEEE International Symposium on Electromagnetic Compatibility\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISEMC.1982.7567732\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1982 IEEE International Symposium on Electromagnetic Compatibility","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISEMC.1982.7567732","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

需要测试军用和非军事子系统的能力,以容忍不可避免的瞬态变化的电气母线电压为它们供电。各种军用和非军事标准定义交流和直流电力线暂降和浪涌限制的持续时间大于1毫秒进行比较。提出了在EMC测试实验室中模拟这种瞬变条件的论点,无论是在设备开发试验期间还是作为设备生产合格试验的一部分。讨论了电力线暂降和浪涌条件的实验室生产,并对离线功率放大器和在线晶闸管控制器测试设备进行了详细的比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Power Sag/Surge Testing for Equipment Reliability Improvement
The need for testing military and non-military subsystems for their ability to tolerate inevitable transient variations in the electrical bus voltage powering them is established. Various military and non-military standards defining AC and DC powerline sag and surge limits for durations greater than 1 millisecond are compared. Arguments are put forth for simulating such transient conditions in the EMC Test Laboratory, both during equipment development tests and as part of the equipment production qualification tests. Laboratory production of powerline sag and surge conditions is discussed, with a detailed compar­ ison of off-line power amplifiers and on-line thyristor controllers test equipments being made.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信