{"title":"将定性风险评价作为矿山岩土工程风险的先导指标","authors":"E. Hamman, J. Venter","doi":"10.36487/ACG_REP/1905_05_HAMMAN","DOIUrl":null,"url":null,"abstract":"Investor confidence is largely driven by a mining company’s ability to deliver on the guaranteed return on investment. Thus, robust due diligence processes, functioning as part of a mining company’s corporate governance, become essential tools to identify hazards that can impact production, assess the associated risks and introduce controls to manage the risks. \nThe geotechnical practitioner is tasked to manage one of the biggest risks on the mine; that of a rock mass instability. Since an instability, or collapse, need not be large to have a significant impact on production, the challenge is to develop an optimised life-of-mine design with a risk management plan that suits the risk requirements of the mining company and investors, whilst meeting acceptable, minimum safety standards. \nThe concept of a Geotechnical Review Board has been adopted in the industry as a vehicle to provide assurance that the geotechnical risks on a mine have been identified and are being properly managed. The review relies on external parties providing appraisals of the design and processes, and experienced oversight of the active operations. In general, these reviews tend to have a unique style; often a combination of the current, visible, critical issues on the mine and issues deemed as important by either the reviewer or a third party. Coupled with the challenge of fluidity in modern planning environments, the geotechnical practitioner is often still faced with uncertainty in the level of geotechnical risk associated with any given mine plan. \nThis paper introduces a geotechnical risk assessment tool that has been developed for use as a leading indicator within AngloGold Ashanti’s international operations. The authors aim to provide the reader with insight into how the tool can be utilised to understand a mine’s ability to proactively identify and manage geotechnical hazards, by exploring the following components:","PeriodicalId":337751,"journal":{"name":"Proceedings of the First International Conference on Mining Geomechanical Risk","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Using qualitative risk assessment as a leading indicator for geotechnical risk in mining\",\"authors\":\"E. Hamman, J. Venter\",\"doi\":\"10.36487/ACG_REP/1905_05_HAMMAN\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Investor confidence is largely driven by a mining company’s ability to deliver on the guaranteed return on investment. Thus, robust due diligence processes, functioning as part of a mining company’s corporate governance, become essential tools to identify hazards that can impact production, assess the associated risks and introduce controls to manage the risks. \\nThe geotechnical practitioner is tasked to manage one of the biggest risks on the mine; that of a rock mass instability. Since an instability, or collapse, need not be large to have a significant impact on production, the challenge is to develop an optimised life-of-mine design with a risk management plan that suits the risk requirements of the mining company and investors, whilst meeting acceptable, minimum safety standards. \\nThe concept of a Geotechnical Review Board has been adopted in the industry as a vehicle to provide assurance that the geotechnical risks on a mine have been identified and are being properly managed. The review relies on external parties providing appraisals of the design and processes, and experienced oversight of the active operations. In general, these reviews tend to have a unique style; often a combination of the current, visible, critical issues on the mine and issues deemed as important by either the reviewer or a third party. Coupled with the challenge of fluidity in modern planning environments, the geotechnical practitioner is often still faced with uncertainty in the level of geotechnical risk associated with any given mine plan. \\nThis paper introduces a geotechnical risk assessment tool that has been developed for use as a leading indicator within AngloGold Ashanti’s international operations. The authors aim to provide the reader with insight into how the tool can be utilised to understand a mine’s ability to proactively identify and manage geotechnical hazards, by exploring the following components:\",\"PeriodicalId\":337751,\"journal\":{\"name\":\"Proceedings of the First International Conference on Mining Geomechanical Risk\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the First International Conference on Mining Geomechanical Risk\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36487/ACG_REP/1905_05_HAMMAN\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the First International Conference on Mining Geomechanical Risk","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36487/ACG_REP/1905_05_HAMMAN","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

投资者的信心在很大程度上取决于矿业公司能否实现有保证的投资回报。因此,作为矿业公司治理的一部分,强有力的尽职调查程序成为识别可能影响生产的危险、评估相关风险和引入控制措施以管理风险的重要工具。岩土工程从业者的任务是管理矿山最大的风险之一;岩体的不稳定性。由于不稳定或坍塌并不会对生产产生重大影响,因此面临的挑战是制定优化的矿山生命周期设计和风险管理计划,以适应矿业公司和投资者的风险要求,同时满足可接受的最低安全标准。地质技术审查委员会的概念已被业界采用,作为一种工具,以确保矿山的地质技术风险已被确定并得到妥善管理。审查依赖于外部各方提供的设计和过程的评估,以及对活动操作的有经验的监督。总的来说,这些评论往往有独特的风格;通常是矿中当前可见的关键问题和审稿人或第三方认为重要的问题的组合。再加上现代规划环境中流动性的挑战,岩土工程从业人员往往仍然面临与任何给定矿山计划相关的岩土工程风险水平的不确定性。本文介绍了一种岩土工程风险评估工具,该工具已被开发用作AngloGold Ashanti国际业务的领先指标。作者旨在通过探索以下组成部分,为读者提供如何利用该工具来了解矿山主动识别和管理岩土灾害的能力的见解:
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Using qualitative risk assessment as a leading indicator for geotechnical risk in mining
Investor confidence is largely driven by a mining company’s ability to deliver on the guaranteed return on investment. Thus, robust due diligence processes, functioning as part of a mining company’s corporate governance, become essential tools to identify hazards that can impact production, assess the associated risks and introduce controls to manage the risks. The geotechnical practitioner is tasked to manage one of the biggest risks on the mine; that of a rock mass instability. Since an instability, or collapse, need not be large to have a significant impact on production, the challenge is to develop an optimised life-of-mine design with a risk management plan that suits the risk requirements of the mining company and investors, whilst meeting acceptable, minimum safety standards. The concept of a Geotechnical Review Board has been adopted in the industry as a vehicle to provide assurance that the geotechnical risks on a mine have been identified and are being properly managed. The review relies on external parties providing appraisals of the design and processes, and experienced oversight of the active operations. In general, these reviews tend to have a unique style; often a combination of the current, visible, critical issues on the mine and issues deemed as important by either the reviewer or a third party. Coupled with the challenge of fluidity in modern planning environments, the geotechnical practitioner is often still faced with uncertainty in the level of geotechnical risk associated with any given mine plan. This paper introduces a geotechnical risk assessment tool that has been developed for use as a leading indicator within AngloGold Ashanti’s international operations. The authors aim to provide the reader with insight into how the tool can be utilised to understand a mine’s ability to proactively identify and manage geotechnical hazards, by exploring the following components:
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信