风电快速波动对风电生产商在能源和储备市场联合交易利润的影响

S. Hosseini, J. Toubeau, N. Singh, J. D. De Kooning, N. Kayedpour, G. Crevecoeur, Z. De Grève, .. Vallée, L. Vandevelde
{"title":"风电快速波动对风电生产商在能源和储备市场联合交易利润的影响","authors":"S. Hosseini, J. Toubeau, N. Singh, J. D. De Kooning, N. Kayedpour, G. Crevecoeur, Z. De Grève, .. Vallée, L. Vandevelde","doi":"10.1049/icp.2021.1386","DOIUrl":null,"url":null,"abstract":"In light of the latest technological achievements in wind farm control, wind power producers (WPPs) are motivated to participate in the joint day-ahead energy and reserve market (JERM) so as to obtain additional revenue by offering ancillary services. However, their expected profit is potentially affected by fast fluctuations of the available wind power in real-time, which may prevent them to deliver the capacity offered at the day-ahead stage. In order to evaluate this impact, a stochastic framework aiming at maximizing the WPP's profit in the day-ahead JERM, based on hourly mean wind power forecasts, is firstly developed. Once the optimal bids are obtained, an empirical ex-post analysis is performed to assess the impact of actual wind speed fluctuations on the WPP's profit. Accordingly, the resulting revenue streams from the different market floors are separately compared to their related expected values, so as to determine the losses regarding the inability of both reserve capacity procurement and activation as well as deviations from the scheduled energy. The outcomes confirm that wind speed fluctuations have a significant impact on the WPP's ability to deliver the scheduled reserve, thus negatively impacting its actual profit.","PeriodicalId":223615,"journal":{"name":"The 9th Renewable Power Generation Conference (RPG Dublin Online 2021)","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"IMPACT OF FAST WIND FLUCTUATIONS ON THE PROFIT OF A WIND POWER PRODUCER JOINTLY TRADING IN ENERGY AND RESERVE MARKETS\",\"authors\":\"S. Hosseini, J. Toubeau, N. Singh, J. D. De Kooning, N. Kayedpour, G. Crevecoeur, Z. De Grève, .. Vallée, L. Vandevelde\",\"doi\":\"10.1049/icp.2021.1386\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In light of the latest technological achievements in wind farm control, wind power producers (WPPs) are motivated to participate in the joint day-ahead energy and reserve market (JERM) so as to obtain additional revenue by offering ancillary services. However, their expected profit is potentially affected by fast fluctuations of the available wind power in real-time, which may prevent them to deliver the capacity offered at the day-ahead stage. In order to evaluate this impact, a stochastic framework aiming at maximizing the WPP's profit in the day-ahead JERM, based on hourly mean wind power forecasts, is firstly developed. Once the optimal bids are obtained, an empirical ex-post analysis is performed to assess the impact of actual wind speed fluctuations on the WPP's profit. Accordingly, the resulting revenue streams from the different market floors are separately compared to their related expected values, so as to determine the losses regarding the inability of both reserve capacity procurement and activation as well as deviations from the scheduled energy. The outcomes confirm that wind speed fluctuations have a significant impact on the WPP's ability to deliver the scheduled reserve, thus negatively impacting its actual profit.\",\"PeriodicalId\":223615,\"journal\":{\"name\":\"The 9th Renewable Power Generation Conference (RPG Dublin Online 2021)\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The 9th Renewable Power Generation Conference (RPG Dublin Online 2021)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1049/icp.2021.1386\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The 9th Renewable Power Generation Conference (RPG Dublin Online 2021)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/icp.2021.1386","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

针对风电场调控的最新技术成果,鼓励风电企业参与日前能源储备联合市场(JERM),通过提供辅助服务获得额外收益。然而,他们的预期利润可能会受到实时可用风力发电的快速波动的影响,这可能会阻止他们提供前一天阶段提供的容量。为了评估这种影响,首先建立了一个基于小时平均风电预测的随机框架,以WPP在日前JERM中的利润最大化为目标。获得最优投标后,进行实证事后分析,评估实际风速波动对WPP利润的影响。因此,将不同市场下限产生的收入流分别与其相关的期望值进行比较,从而确定与储备能力采购和激活的无能以及与计划能源的偏差有关的损失。结果证实,风速波动对WPP交付预定储备的能力有重大影响,从而对其实际利润产生负面影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
IMPACT OF FAST WIND FLUCTUATIONS ON THE PROFIT OF A WIND POWER PRODUCER JOINTLY TRADING IN ENERGY AND RESERVE MARKETS
In light of the latest technological achievements in wind farm control, wind power producers (WPPs) are motivated to participate in the joint day-ahead energy and reserve market (JERM) so as to obtain additional revenue by offering ancillary services. However, their expected profit is potentially affected by fast fluctuations of the available wind power in real-time, which may prevent them to deliver the capacity offered at the day-ahead stage. In order to evaluate this impact, a stochastic framework aiming at maximizing the WPP's profit in the day-ahead JERM, based on hourly mean wind power forecasts, is firstly developed. Once the optimal bids are obtained, an empirical ex-post analysis is performed to assess the impact of actual wind speed fluctuations on the WPP's profit. Accordingly, the resulting revenue streams from the different market floors are separately compared to their related expected values, so as to determine the losses regarding the inability of both reserve capacity procurement and activation as well as deviations from the scheduled energy. The outcomes confirm that wind speed fluctuations have a significant impact on the WPP's ability to deliver the scheduled reserve, thus negatively impacting its actual profit.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信