Aldo Duchi, Golboo Pourabdollahian, Davide Sili, Matteo Cioffi, M. Taisch
{"title":"提出了在ETO-MC环境下选择最佳拟合成本估算技术的决策模型","authors":"Aldo Duchi, Golboo Pourabdollahian, Davide Sili, Matteo Cioffi, M. Taisch","doi":"10.1109/IEEM.2014.7058787","DOIUrl":null,"url":null,"abstract":"ETO companies are characterized by their ability to produce purely customized goods through individualized engineering process. However, recently many of ETOs have considered a shift toward MC to operate with more stable processes to increase efficiency and decrease lead time. This paper aims at analyzing this shift from an operational point of view by developing a decision making model to support these companies in selecting the best estimation technique in terms of engineering cost.","PeriodicalId":318405,"journal":{"name":"2014 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"377 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Proposal of a decision making model to select the best fitting cost estimation technique in an ETO-MC environment\",\"authors\":\"Aldo Duchi, Golboo Pourabdollahian, Davide Sili, Matteo Cioffi, M. Taisch\",\"doi\":\"10.1109/IEEM.2014.7058787\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ETO companies are characterized by their ability to produce purely customized goods through individualized engineering process. However, recently many of ETOs have considered a shift toward MC to operate with more stable processes to increase efficiency and decrease lead time. This paper aims at analyzing this shift from an operational point of view by developing a decision making model to support these companies in selecting the best estimation technique in terms of engineering cost.\",\"PeriodicalId\":318405,\"journal\":{\"name\":\"2014 IEEE International Conference on Industrial Engineering and Engineering Management\",\"volume\":\"377 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2014.7058787\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2014.7058787","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Proposal of a decision making model to select the best fitting cost estimation technique in an ETO-MC environment
ETO companies are characterized by their ability to produce purely customized goods through individualized engineering process. However, recently many of ETOs have considered a shift toward MC to operate with more stable processes to increase efficiency and decrease lead time. This paper aims at analyzing this shift from an operational point of view by developing a decision making model to support these companies in selecting the best estimation technique in terms of engineering cost.