{"title":"基于过零开关的变压器经济运行控制系统","authors":"Sundong He, Qing Li, Renyuan Tong, Ge Shi","doi":"10.1109/IAEAC.2015.7428605","DOIUrl":null,"url":null,"abstract":"The active power loss and reactive power loss nonlinear varied with the load, so the loss was controllable. This study built simulation experiment platform, subjects was two single-phase double winding transformer, based on method of transformer economic operation critical section. It introduced hardware and software design. Hardware circuits included electric parameters measurement circuit, AC contactor switching time measurement circuit, voltage or current zero-crossing point capture circuit and so on. Then the zero-crossing switching was put forward to reduce the transformer switching operation safety hazard. The experimental data shows load power and voltage current zero-crossing are detected exactly, AC contactor operation time was discrete, but declines with the supply voltage increasing, changes linearly. The accuracy rate, transformer economic operation and flexible switching with voltage¤t zero-crossing, is 94.3%.","PeriodicalId":398100,"journal":{"name":"2015 IEEE Advanced Information Technology, Electronic and Automation Control Conference (IAEAC)","volume":"69 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Transformer economic operation control system based on zero-crossing switching\",\"authors\":\"Sundong He, Qing Li, Renyuan Tong, Ge Shi\",\"doi\":\"10.1109/IAEAC.2015.7428605\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The active power loss and reactive power loss nonlinear varied with the load, so the loss was controllable. This study built simulation experiment platform, subjects was two single-phase double winding transformer, based on method of transformer economic operation critical section. It introduced hardware and software design. Hardware circuits included electric parameters measurement circuit, AC contactor switching time measurement circuit, voltage or current zero-crossing point capture circuit and so on. Then the zero-crossing switching was put forward to reduce the transformer switching operation safety hazard. The experimental data shows load power and voltage current zero-crossing are detected exactly, AC contactor operation time was discrete, but declines with the supply voltage increasing, changes linearly. The accuracy rate, transformer economic operation and flexible switching with voltage¤t zero-crossing, is 94.3%.\",\"PeriodicalId\":398100,\"journal\":{\"name\":\"2015 IEEE Advanced Information Technology, Electronic and Automation Control Conference (IAEAC)\",\"volume\":\"69 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE Advanced Information Technology, Electronic and Automation Control Conference (IAEAC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IAEAC.2015.7428605\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Advanced Information Technology, Electronic and Automation Control Conference (IAEAC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAEAC.2015.7428605","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Transformer economic operation control system based on zero-crossing switching
The active power loss and reactive power loss nonlinear varied with the load, so the loss was controllable. This study built simulation experiment platform, subjects was two single-phase double winding transformer, based on method of transformer economic operation critical section. It introduced hardware and software design. Hardware circuits included electric parameters measurement circuit, AC contactor switching time measurement circuit, voltage or current zero-crossing point capture circuit and so on. Then the zero-crossing switching was put forward to reduce the transformer switching operation safety hazard. The experimental data shows load power and voltage current zero-crossing are detected exactly, AC contactor operation time was discrete, but declines with the supply voltage increasing, changes linearly. The accuracy rate, transformer economic operation and flexible switching with voltage¤t zero-crossing, is 94.3%.