{"title":"非标称条件下委内瑞拉互联电力系统低频自动甩负荷和区域断开系统的性能","authors":"L. Villa","doi":"10.1109/TDCLA.2006.311591","DOIUrl":null,"url":null,"abstract":"During the first months of 2003, the Venezuelan interconnected power system peak load fell more than 10 % below the maximum of 2002. Furthermore emergency conditions forced to operate at 59.9 Hz steady state frequency, 0.1 Hz below its nominal value. Because of this, it was necessary to check the correct performance of the automatic load rejection and area disconnection system","PeriodicalId":406067,"journal":{"name":"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Performance of the Low Frequency Automatic Load Rejection and Area Disconnection Systems of the Venezuelan Interconnected Electric Power System under off-nominal Conditions\",\"authors\":\"L. Villa\",\"doi\":\"10.1109/TDCLA.2006.311591\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"During the first months of 2003, the Venezuelan interconnected power system peak load fell more than 10 % below the maximum of 2002. Furthermore emergency conditions forced to operate at 59.9 Hz steady state frequency, 0.1 Hz below its nominal value. Because of this, it was necessary to check the correct performance of the automatic load rejection and area disconnection system\",\"PeriodicalId\":406067,\"journal\":{\"name\":\"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLA.2006.311591\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLA.2006.311591","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在2003年的头几个月,委内瑞拉互联电力系统的峰值负荷比2002年的峰值下降了10%以上。此外,在紧急情况下,被迫以59.9 Hz的稳态频率运行,比标称值低0.1 Hz。因此,有必要对自动弃负荷和区域断开系统的正确性能进行检查
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Performance of the Low Frequency Automatic Load Rejection and Area Disconnection Systems of the Venezuelan Interconnected Electric Power System under off-nominal Conditions
During the first months of 2003, the Venezuelan interconnected power system peak load fell more than 10 % below the maximum of 2002. Furthermore emergency conditions forced to operate at 59.9 Hz steady state frequency, 0.1 Hz below its nominal value. Because of this, it was necessary to check the correct performance of the automatic load rejection and area disconnection system
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信