{"title":"钻井泥浆泵压力缸液压系统可靠性分析","authors":"Deliang Gu, Kuisheng Chen, Xinbo Qian, Congchang Zhan","doi":"10.1109/TSA.2016.25","DOIUrl":null,"url":null,"abstract":"The drilling pump is one of three major parts of a drilling rig, and is the key equipment of the drilling fluid circulation system. In this paper, the reliability of a ZCL-1600-type drilling mud pump pressure cylinder of the hydraulic system is carried on the thorough discussion. The reliability block diagram is established by qualitative analysis and quantitative calculation. Reliability assessment is calculated for the hydraulic system under a specific operation condition. Moreover, a mathematical model is established to optimize the maintenance interval for the hydraulic system by minimizing the maintenance cost. Finally, two case studies are illustrated to verify the reliability and maintenance model by simulation based on Matlab.","PeriodicalId":114541,"journal":{"name":"2016 Third International Conference on Trustworthy Systems and their Applications (TSA)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Reliability Analysis of Drilling Mud Pump Pressure Cylinder Hydraulic System\",\"authors\":\"Deliang Gu, Kuisheng Chen, Xinbo Qian, Congchang Zhan\",\"doi\":\"10.1109/TSA.2016.25\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The drilling pump is one of three major parts of a drilling rig, and is the key equipment of the drilling fluid circulation system. In this paper, the reliability of a ZCL-1600-type drilling mud pump pressure cylinder of the hydraulic system is carried on the thorough discussion. The reliability block diagram is established by qualitative analysis and quantitative calculation. Reliability assessment is calculated for the hydraulic system under a specific operation condition. Moreover, a mathematical model is established to optimize the maintenance interval for the hydraulic system by minimizing the maintenance cost. Finally, two case studies are illustrated to verify the reliability and maintenance model by simulation based on Matlab.\",\"PeriodicalId\":114541,\"journal\":{\"name\":\"2016 Third International Conference on Trustworthy Systems and their Applications (TSA)\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 Third International Conference on Trustworthy Systems and their Applications (TSA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TSA.2016.25\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 Third International Conference on Trustworthy Systems and their Applications (TSA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TSA.2016.25","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

钻井泵是钻机的三大部件之一,是钻井液循环系统的关键设备。本文对zcl -1600型钻井泥浆泵压力缸液压系统的可靠性进行了深入的探讨。通过定性分析和定量计算,建立了可靠性框图。对液压系统在特定工况下的可靠性进行了计算。在此基础上,建立了以最小化维修成本为目标的液压系统维修间隔优化数学模型。最后,通过两个实例验证了基于Matlab的可靠性和维护模型的仿真。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reliability Analysis of Drilling Mud Pump Pressure Cylinder Hydraulic System
The drilling pump is one of three major parts of a drilling rig, and is the key equipment of the drilling fluid circulation system. In this paper, the reliability of a ZCL-1600-type drilling mud pump pressure cylinder of the hydraulic system is carried on the thorough discussion. The reliability block diagram is established by qualitative analysis and quantitative calculation. Reliability assessment is calculated for the hydraulic system under a specific operation condition. Moreover, a mathematical model is established to optimize the maintenance interval for the hydraulic system by minimizing the maintenance cost. Finally, two case studies are illustrated to verify the reliability and maintenance model by simulation based on Matlab.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信