{"title":"区间调度、资源受限调度和低秩调度的(In-)近似结果","authors":"M. Maack, Simon Pukrop, A. R. Rasmussen","doi":"10.48550/arXiv.2203.06171","DOIUrl":null,"url":null,"abstract":"We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with the goal of makespan minimization. For the variant with interval restrictions, where the machines can be arranged on a path such that each job is eligible on a subpath, we present the first better than $2$-approximation and an improved inapproximability result. In particular, we give a $(2-\\frac{1}{24})$-approximation and show that no better than $9/8$-approximation is possible, unless P=NP. Furthermore, we consider restricted assignment with $R$ resource restrictions and rank $D$ unrelated scheduling. In the former problem, a machine may process a job if it can meet its resource requirements regarding $R$ (renewable) resources. In the latter, the size of a job is dependent on the machine it is assigned to and the corresponding processing time matrix has rank at most $D$. The problem with interval restrictions includes the 1 resource variant, is encompassed by the 2 resource variant, and regarding approximation the $R$ resource variant is essentially a special case of the rank $R+1$ problem. We show that no better than $3/2$, $8/7$, and $3/2$-approximation is possible (unless P=NP) for the 3 resource, 2 resource, and rank 3 variant, respectively. Both the approximation result for the interval case and the inapproximability result for the rank 3 variant are solutions to open challenges stated in previous works. Lastly, we also consider the reverse objective, that is, maximizing the minimal load any machine receives, and achieve similar results.","PeriodicalId":201778,"journal":{"name":"Embedded Systems and Applications","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"(In-)Approximability Results for Interval, Resource Restricted, and Low Rank Scheduling\",\"authors\":\"M. Maack, Simon Pukrop, A. R. Rasmussen\",\"doi\":\"10.48550/arXiv.2203.06171\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with the goal of makespan minimization. For the variant with interval restrictions, where the machines can be arranged on a path such that each job is eligible on a subpath, we present the first better than $2$-approximation and an improved inapproximability result. In particular, we give a $(2-\\\\frac{1}{24})$-approximation and show that no better than $9/8$-approximation is possible, unless P=NP. Furthermore, we consider restricted assignment with $R$ resource restrictions and rank $D$ unrelated scheduling. In the former problem, a machine may process a job if it can meet its resource requirements regarding $R$ (renewable) resources. In the latter, the size of a job is dependent on the machine it is assigned to and the corresponding processing time matrix has rank at most $D$. The problem with interval restrictions includes the 1 resource variant, is encompassed by the 2 resource variant, and regarding approximation the $R$ resource variant is essentially a special case of the rank $R+1$ problem. We show that no better than $3/2$, $8/7$, and $3/2$-approximation is possible (unless P=NP) for the 3 resource, 2 resource, and rank 3 variant, respectively. Both the approximation result for the interval case and the inapproximability result for the rank 3 variant are solutions to open challenges stated in previous works. Lastly, we also consider the reverse objective, that is, maximizing the minimal load any machine receives, and achieve similar results.\",\"PeriodicalId\":201778,\"journal\":{\"name\":\"Embedded Systems and Applications\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Embedded Systems and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.48550/arXiv.2203.06171\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Embedded Systems and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.48550/arXiv.2203.06171","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

我们考虑了限制分配问题的变体,其中一组作业必须分配给一组机器,每个作业给定一个尺寸和一组符合条件的机器,并且作业只能分配给符合条件的机器,目标是最大完工时间最小化。对于具有区间限制的变量,其中机器可以安排在一条路径上,使得每个作业都符合子路径的条件,我们给出了第一个优于$2$的近似和改进的不可逼近性结果。特别地,我们给出了$(2-\frac{1}{24})$-近似,并表明除非P=NP,否则不可能有比$9/8$-更好的近似。此外,我们考虑了$R$资源限制的受限分配和$D$不相关调度。在前一个问题中,如果机器能够满足其关于R(可再生)资源的资源需求,则可以处理作业。在后者中,作业的大小取决于它被分配到的机器,相应的处理时间矩阵的排名最多为D。区间限制的问题包括1个资源变量,被2个资源变量所包围,关于近似$R$资源变量本质上是秩$R+1$问题的特殊情况。我们表明,对于3资源、2资源和排名3的变量,分别不可能有比$3/2$、$8/7$和$3/2$更好的近似(除非P=NP)。区间情况下的近似结果和3阶变量的不近似结果都是对先前工作中提出的开放挑战的解决方案。最后,我们还考虑了相反的目标,即最大化任何机器接收的最小负载,并获得了类似的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
(In-)Approximability Results for Interval, Resource Restricted, and Low Rank Scheduling
We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with the goal of makespan minimization. For the variant with interval restrictions, where the machines can be arranged on a path such that each job is eligible on a subpath, we present the first better than $2$-approximation and an improved inapproximability result. In particular, we give a $(2-\frac{1}{24})$-approximation and show that no better than $9/8$-approximation is possible, unless P=NP. Furthermore, we consider restricted assignment with $R$ resource restrictions and rank $D$ unrelated scheduling. In the former problem, a machine may process a job if it can meet its resource requirements regarding $R$ (renewable) resources. In the latter, the size of a job is dependent on the machine it is assigned to and the corresponding processing time matrix has rank at most $D$. The problem with interval restrictions includes the 1 resource variant, is encompassed by the 2 resource variant, and regarding approximation the $R$ resource variant is essentially a special case of the rank $R+1$ problem. We show that no better than $3/2$, $8/7$, and $3/2$-approximation is possible (unless P=NP) for the 3 resource, 2 resource, and rank 3 variant, respectively. Both the approximation result for the interval case and the inapproximability result for the rank 3 variant are solutions to open challenges stated in previous works. Lastly, we also consider the reverse objective, that is, maximizing the minimal load any machine receives, and achieve similar results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信