一类加工线的组合启发式优化方法

O. Guschinskaya, A. Dolgui, N. Guschinsky, G. Levin
{"title":"一类加工线的组合启发式优化方法","authors":"O. Guschinskaya, A. Dolgui, N. Guschinsky, G. Levin","doi":"10.1109/COASE.2005.1506761","DOIUrl":null,"url":null,"abstract":"The paper deals with the minimization of the number of pieces of equipment for transfer lines with multi-spindle workstations. The preliminary design stage is considered. The machining operations are grouped into blocks. Each block executed by one spindle head. The relations of the necessity and the possibility of combining operations in blocks and workstations as well as precedence constraints are given. The problem is to find the best assignment of operations to blocks and to workstations, whereas minimizing the number of pieces of equipment used. The solution must provide a desired productivity (cycle time), it must also satisfy precedence and compatibility constraints. The problem is a generalization of the simple assembly line balancing problem. A combined heuristic approach is proposed. It is based on decomposition of the initial problem into several sub-problems and solving them by an exact algorithm. Results of computational experiments are presented.","PeriodicalId":181408,"journal":{"name":"IEEE International Conference on Automation Science and Engineering, 2005.","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A combined heuristic approach for optimization of a class of machining lines\",\"authors\":\"O. Guschinskaya, A. Dolgui, N. Guschinsky, G. Levin\",\"doi\":\"10.1109/COASE.2005.1506761\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper deals with the minimization of the number of pieces of equipment for transfer lines with multi-spindle workstations. The preliminary design stage is considered. The machining operations are grouped into blocks. Each block executed by one spindle head. The relations of the necessity and the possibility of combining operations in blocks and workstations as well as precedence constraints are given. The problem is to find the best assignment of operations to blocks and to workstations, whereas minimizing the number of pieces of equipment used. The solution must provide a desired productivity (cycle time), it must also satisfy precedence and compatibility constraints. The problem is a generalization of the simple assembly line balancing problem. A combined heuristic approach is proposed. It is based on decomposition of the initial problem into several sub-problems and solving them by an exact algorithm. Results of computational experiments are presented.\",\"PeriodicalId\":181408,\"journal\":{\"name\":\"IEEE International Conference on Automation Science and Engineering, 2005.\",\"volume\":\"47 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE International Conference on Automation Science and Engineering, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/COASE.2005.1506761\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE International Conference on Automation Science and Engineering, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/COASE.2005.1506761","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文讨论了多轴工位传输线设备件数的最小化问题。考虑初步设计阶段。加工操作被分组成块。每个块由一个主轴头执行。给出了分块作业与工作站作业相结合的必要性和可能性关系以及优先约束条件。问题是找到最佳的操作分配到块和工作站,同时最小化所使用的设备的数量。解决方案必须提供所需的生产力(周期时间),还必须满足优先级和兼容性约束。该问题是简单装配线平衡问题的推广。提出了一种组合启发式方法。它是基于将初始问题分解成若干子问题,并用精确的算法求解它们。给出了计算实验结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A combined heuristic approach for optimization of a class of machining lines
The paper deals with the minimization of the number of pieces of equipment for transfer lines with multi-spindle workstations. The preliminary design stage is considered. The machining operations are grouped into blocks. Each block executed by one spindle head. The relations of the necessity and the possibility of combining operations in blocks and workstations as well as precedence constraints are given. The problem is to find the best assignment of operations to blocks and to workstations, whereas minimizing the number of pieces of equipment used. The solution must provide a desired productivity (cycle time), it must also satisfy precedence and compatibility constraints. The problem is a generalization of the simple assembly line balancing problem. A combined heuristic approach is proposed. It is based on decomposition of the initial problem into several sub-problems and solving them by an exact algorithm. Results of computational experiments are presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信