{"title":"能源公司项目风险管理自动化","authors":"Y. Krukhmaleva","doi":"10.1109/IT&QM&IS.2019.8928364","DOIUrl":null,"url":null,"abstract":"The specific character of energy company's projects based on the principles of project investment is presented. The process of creating a risk management system as part of company's projects is described. Justification of efficiency of the chosen model and automation of the risk analysis process at each workplace is given.","PeriodicalId":285904,"journal":{"name":"2019 International Conference \"Quality Management, Transport and Information Security, Information Technologies\" (IT&QM&IS)","volume":"70 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk Management Automation in Energy Company Projects\",\"authors\":\"Y. Krukhmaleva\",\"doi\":\"10.1109/IT&QM&IS.2019.8928364\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The specific character of energy company's projects based on the principles of project investment is presented. The process of creating a risk management system as part of company's projects is described. Justification of efficiency of the chosen model and automation of the risk analysis process at each workplace is given.\",\"PeriodicalId\":285904,\"journal\":{\"name\":\"2019 International Conference \\\"Quality Management, Transport and Information Security, Information Technologies\\\" (IT&QM&IS)\",\"volume\":\"70 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 International Conference \\\"Quality Management, Transport and Information Security, Information Technologies\\\" (IT&QM&IS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IT&QM&IS.2019.8928364\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Conference \"Quality Management, Transport and Information Security, Information Technologies\" (IT&QM&IS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IT&QM&IS.2019.8928364","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Risk Management Automation in Energy Company Projects
The specific character of energy company's projects based on the principles of project investment is presented. The process of creating a risk management system as part of company's projects is described. Justification of efficiency of the chosen model and automation of the risk analysis process at each workplace is given.