基站共享电力塔防雷与接地安全评价研究

Huan Huang, Yan Hong Xiao, Siwu Yu, X. Mao, Bin Li, Lei Liu, C. Peng, Hao Du
{"title":"基站共享电力塔防雷与接地安全评价研究","authors":"Huan Huang, Yan Hong Xiao, Siwu Yu, X. Mao, Bin Li, Lei Liu, C. Peng, Hao Du","doi":"10.1109/CIEEC54735.2022.9846165","DOIUrl":null,"url":null,"abstract":"Building 5g base station on power tower is an effective way to realize resource integration and save national resources. However, the voltage level and installed capacity of power system and communication system are far from each other. We must take into account their lightning protection and grounding requirements, conduct comprehensive research, and put forward reliable measures to ensure the safe operation of shared tower. Based on the structure of 220kV power tower and communication machine room, the simulation model of shared tower is established, and multiple observation potentials are set in the shared tower. By analyzing and calculating the ground potential appreciation of observation points under different lightning currents, different earth resistivity and different installation positions, an important conclusion is drawn: in order to ensure the power line in communication machine room The optical cable, antenna metal support and iron tower will not be broken down. The grounding grid of communication machine room and power tower must adopt the joint grounding mode, and the improvement suggestions for the original grounding mode are put forward.","PeriodicalId":416229,"journal":{"name":"2022 IEEE 5th International Electrical and Energy Conference (CIEEC)","volume":"97 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"research on lightning protection and grounding safety evaluation of base station shared power tower\",\"authors\":\"Huan Huang, Yan Hong Xiao, Siwu Yu, X. Mao, Bin Li, Lei Liu, C. Peng, Hao Du\",\"doi\":\"10.1109/CIEEC54735.2022.9846165\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Building 5g base station on power tower is an effective way to realize resource integration and save national resources. However, the voltage level and installed capacity of power system and communication system are far from each other. We must take into account their lightning protection and grounding requirements, conduct comprehensive research, and put forward reliable measures to ensure the safe operation of shared tower. Based on the structure of 220kV power tower and communication machine room, the simulation model of shared tower is established, and multiple observation potentials are set in the shared tower. By analyzing and calculating the ground potential appreciation of observation points under different lightning currents, different earth resistivity and different installation positions, an important conclusion is drawn: in order to ensure the power line in communication machine room The optical cable, antenna metal support and iron tower will not be broken down. The grounding grid of communication machine room and power tower must adopt the joint grounding mode, and the improvement suggestions for the original grounding mode are put forward.\",\"PeriodicalId\":416229,\"journal\":{\"name\":\"2022 IEEE 5th International Electrical and Energy Conference (CIEEC)\",\"volume\":\"97 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE 5th International Electrical and Energy Conference (CIEEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CIEEC54735.2022.9846165\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE 5th International Electrical and Energy Conference (CIEEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIEEC54735.2022.9846165","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在电力塔上建设5g基站是实现资源整合、节约国家资源的有效途径。然而,电力系统和通信系统的电压等级和装机容量相差甚远。我们必须考虑到它们的防雷和接地要求,进行全面的研究,提出可靠的措施,保证共用塔的安全运行。根据220kV电力塔和通信机房的结构,建立共享塔的仿真模型,在共享塔内设置多个观测电位。通过对不同雷电电流、不同地电阻率、不同安装位置下观测点的地电位升值进行分析计算,得出一个重要结论:为了保证通信机房的电力线光缆、天线金属支架、铁塔不被击穿。通信机房和电力塔的接地网必须采用联合接地方式,并对原有接地方式提出了改进建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
research on lightning protection and grounding safety evaluation of base station shared power tower
Building 5g base station on power tower is an effective way to realize resource integration and save national resources. However, the voltage level and installed capacity of power system and communication system are far from each other. We must take into account their lightning protection and grounding requirements, conduct comprehensive research, and put forward reliable measures to ensure the safe operation of shared tower. Based on the structure of 220kV power tower and communication machine room, the simulation model of shared tower is established, and multiple observation potentials are set in the shared tower. By analyzing and calculating the ground potential appreciation of observation points under different lightning currents, different earth resistivity and different installation positions, an important conclusion is drawn: in order to ensure the power line in communication machine room The optical cable, antenna metal support and iron tower will not be broken down. The grounding grid of communication machine room and power tower must adopt the joint grounding mode, and the improvement suggestions for the original grounding mode are put forward.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信