四川盆地高温高压深井长裸眼段水泥浆系统

Yan Haibing, Li Meiping, Chunquan Wang, Liu Yang, Wenzhong Liu, Zhao Qiyang
{"title":"四川盆地高温高压深井长裸眼段水泥浆系统","authors":"Yan Haibing, Li Meiping, Chunquan Wang, Liu Yang, Wenzhong Liu, Zhao Qiyang","doi":"10.2118/198581-ms","DOIUrl":null,"url":null,"abstract":"\n The depth of natural gas wells in the Sichuan Basin ranges from 5500 m to 7500 m, the temperature of the target layer ranges from 140 °C to 160 °C, the pressure coefficient of the layer is 2.05~2.35, and the length of the open hole section is 2800 m to 4000m. The complex formation with multiple production layers and multiple leakage layers results in many challenges for well construction engineering. During cementing of a deep well, the challenges include high temperature and pressure, gas migration and leakage, and \"ultra-retardation\" at the top of the cement column when a cement slurry is used to address the problem oflong-interval isolation.\n To solve the complex technical problems encountered during cementing, a multi-function cement slurry system was developed for long-interval isolation at temperatures between 70 °C and 160 °C. The maximum compressive strength of the cement slurry at the top of the cement column with 4000m length was reached after 48 h and the cement slurry exhibited good leak-proof and anti-gas channeling performance. After mechanical modification, Young's modulus of the cement paste was lower than that of the conventional cement slurry (less than 6.0GPa) and the tensile strength of the cement paste was 30% higher, exhibiting an improvement in the damage resistance of the cement sheath. The cement slurry system was successfully applied to more than 100 high-temperature high-pressure wells in the Sichuan Basin, reaching maximum values of 7793 m well depth, 3954 m length of the liner cementing section, 100 °C temperature difference, and 2.40 g/cm3 cement slurry density.","PeriodicalId":182237,"journal":{"name":"Day 3 Wed, October 23, 2019","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Cement Slurry System for the Long Open Hole Section of High-Pressure High-Temperature Deep Wells in the Sichuan Basin\",\"authors\":\"Yan Haibing, Li Meiping, Chunquan Wang, Liu Yang, Wenzhong Liu, Zhao Qiyang\",\"doi\":\"10.2118/198581-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The depth of natural gas wells in the Sichuan Basin ranges from 5500 m to 7500 m, the temperature of the target layer ranges from 140 °C to 160 °C, the pressure coefficient of the layer is 2.05~2.35, and the length of the open hole section is 2800 m to 4000m. The complex formation with multiple production layers and multiple leakage layers results in many challenges for well construction engineering. During cementing of a deep well, the challenges include high temperature and pressure, gas migration and leakage, and \\\"ultra-retardation\\\" at the top of the cement column when a cement slurry is used to address the problem oflong-interval isolation.\\n To solve the complex technical problems encountered during cementing, a multi-function cement slurry system was developed for long-interval isolation at temperatures between 70 °C and 160 °C. The maximum compressive strength of the cement slurry at the top of the cement column with 4000m length was reached after 48 h and the cement slurry exhibited good leak-proof and anti-gas channeling performance. After mechanical modification, Young's modulus of the cement paste was lower than that of the conventional cement slurry (less than 6.0GPa) and the tensile strength of the cement paste was 30% higher, exhibiting an improvement in the damage resistance of the cement sheath. The cement slurry system was successfully applied to more than 100 high-temperature high-pressure wells in the Sichuan Basin, reaching maximum values of 7793 m well depth, 3954 m length of the liner cementing section, 100 °C temperature difference, and 2.40 g/cm3 cement slurry density.\",\"PeriodicalId\":182237,\"journal\":{\"name\":\"Day 3 Wed, October 23, 2019\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, October 23, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/198581-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, October 23, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/198581-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

四川盆地天然气井深5500 ~ 7500 m,目标层温度140 ~ 160℃,层压系数2.05~2.35,裸眼段长度2800 ~ 4000m。具有多生产层和多泄漏层的复杂地层给建井工程带来了许多挑战。在深井固井过程中,面临的挑战包括高温高压、气体运移和泄漏,以及在使用水泥浆来解决长井段隔离问题时,水泥柱顶部的“超缓凝”现象。为了解决固井过程中遇到的复杂技术问题,开发了一种多功能水泥浆系统,可在70°C至160°C之间进行长间隔隔离。在长度为4000m的水泥柱顶部,水泥浆在48 h后达到最大抗压强度,水泥浆具有良好的防漏和防窜气性能。经机械改性后,水泥浆体的杨氏模量低于常规水泥浆体(小于6.0GPa),水泥浆体的抗拉强度提高30%,水泥环的抗损伤能力得到提高。该水泥浆体系成功应用于四川盆地100多口高温高压井,最大井深7793 m,尾管固井段长度3954 m,温差100℃,水泥浆密度2.40 g/cm3。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Cement Slurry System for the Long Open Hole Section of High-Pressure High-Temperature Deep Wells in the Sichuan Basin
The depth of natural gas wells in the Sichuan Basin ranges from 5500 m to 7500 m, the temperature of the target layer ranges from 140 °C to 160 °C, the pressure coefficient of the layer is 2.05~2.35, and the length of the open hole section is 2800 m to 4000m. The complex formation with multiple production layers and multiple leakage layers results in many challenges for well construction engineering. During cementing of a deep well, the challenges include high temperature and pressure, gas migration and leakage, and "ultra-retardation" at the top of the cement column when a cement slurry is used to address the problem oflong-interval isolation. To solve the complex technical problems encountered during cementing, a multi-function cement slurry system was developed for long-interval isolation at temperatures between 70 °C and 160 °C. The maximum compressive strength of the cement slurry at the top of the cement column with 4000m length was reached after 48 h and the cement slurry exhibited good leak-proof and anti-gas channeling performance. After mechanical modification, Young's modulus of the cement paste was lower than that of the conventional cement slurry (less than 6.0GPa) and the tensile strength of the cement paste was 30% higher, exhibiting an improvement in the damage resistance of the cement sheath. The cement slurry system was successfully applied to more than 100 high-temperature high-pressure wells in the Sichuan Basin, reaching maximum values of 7793 m well depth, 3954 m length of the liner cementing section, 100 °C temperature difference, and 2.40 g/cm3 cement slurry density.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信