{"title":"基于混合模型的计算网格负荷预测","authors":"Yongwei Wu, Yulai Yuan, Guangwen Yang, Weimin Zheng","doi":"10.1109/GRID.2007.4354138","DOIUrl":null,"url":null,"abstract":"Due to the dynamic nature of grid environments, schedule algorithms always need assistance of a long-time-ahead load prediction to make decisions on how to use grid resources efficiently. In this paper, we present and evaluate a new hybrid model, which predicts the n-step-ahead load status by using interval values. This model integrates autoregressive (AR) model with confidence interval estimations to forecast the future load of a system. Meanwhile, two filtering technologies from signal processing field are also introduced into this model to eliminate data noise and enhance prediction accuracy. The results of experiments conducted on a real grid environment demonstrate that this new model is more capable of predicting n-step-ahead load in a computational grid than previous works. The proposed hybrid model performs well on prediction advance time for up to 50 minutes, with significant less prediction errors than conventional AR model. It also achieves an interval length acceptable for task scheduler.","PeriodicalId":304508,"journal":{"name":"2007 8th IEEE/ACM International Conference on Grid Computing","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"55","resultStr":"{\"title\":\"Load prediction using hybrid model for computational grid\",\"authors\":\"Yongwei Wu, Yulai Yuan, Guangwen Yang, Weimin Zheng\",\"doi\":\"10.1109/GRID.2007.4354138\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Due to the dynamic nature of grid environments, schedule algorithms always need assistance of a long-time-ahead load prediction to make decisions on how to use grid resources efficiently. In this paper, we present and evaluate a new hybrid model, which predicts the n-step-ahead load status by using interval values. This model integrates autoregressive (AR) model with confidence interval estimations to forecast the future load of a system. Meanwhile, two filtering technologies from signal processing field are also introduced into this model to eliminate data noise and enhance prediction accuracy. The results of experiments conducted on a real grid environment demonstrate that this new model is more capable of predicting n-step-ahead load in a computational grid than previous works. The proposed hybrid model performs well on prediction advance time for up to 50 minutes, with significant less prediction errors than conventional AR model. It also achieves an interval length acceptable for task scheduler.\",\"PeriodicalId\":304508,\"journal\":{\"name\":\"2007 8th IEEE/ACM International Conference on Grid Computing\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-09-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"55\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 8th IEEE/ACM International Conference on Grid Computing\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/GRID.2007.4354138\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 8th IEEE/ACM International Conference on Grid Computing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/GRID.2007.4354138","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Load prediction using hybrid model for computational grid
Due to the dynamic nature of grid environments, schedule algorithms always need assistance of a long-time-ahead load prediction to make decisions on how to use grid resources efficiently. In this paper, we present and evaluate a new hybrid model, which predicts the n-step-ahead load status by using interval values. This model integrates autoregressive (AR) model with confidence interval estimations to forecast the future load of a system. Meanwhile, two filtering technologies from signal processing field are also introduced into this model to eliminate data noise and enhance prediction accuracy. The results of experiments conducted on a real grid environment demonstrate that this new model is more capable of predicting n-step-ahead load in a computational grid than previous works. The proposed hybrid model performs well on prediction advance time for up to 50 minutes, with significant less prediction errors than conventional AR model. It also achieves an interval length acceptable for task scheduler.