三邦县班加尔村基础设施建设中的官僚主义病理

Nur Holifah, Novita Maulida Ikmal, Lutfia Nurul Hidayati
{"title":"三邦县班加尔村基础设施建设中的官僚主义病理","authors":"Nur Holifah, Novita Maulida Ikmal, Lutfia Nurul Hidayati","doi":"10.52423/neores.v4i1.37","DOIUrl":null,"url":null,"abstract":"This study used bureaucratic theory and bureaucratic pathology to reveal bureaucratic pathologies that occur in villages in the context of infrastructure development that often occurs in Banjar village. The basis of the research used is descriptive qualitative method. The results of this study, firstly, the phenomenon of bureaucratic pathology in infrastructure development in the village of Banjar is still encountered such as frequent discrepancies between the proposals submitted and reports made from the infrastructure development process (incompatibility of budget allocation for infrastructure development). Second, the strategy for rehabilitating bureaucratic pathology in infrastructure development that occurs by gradually monitoring each infrastructure development project that is being worked on, in collaboration with professional and competent construction parties.","PeriodicalId":193518,"journal":{"name":"NeoRespublica: Jurnal Ilmu Pemerintahan","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Bureaucracy Pathology in Infrastructure Development of Banjar Village, Sampang Regency\",\"authors\":\"Nur Holifah, Novita Maulida Ikmal, Lutfia Nurul Hidayati\",\"doi\":\"10.52423/neores.v4i1.37\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study used bureaucratic theory and bureaucratic pathology to reveal bureaucratic pathologies that occur in villages in the context of infrastructure development that often occurs in Banjar village. The basis of the research used is descriptive qualitative method. The results of this study, firstly, the phenomenon of bureaucratic pathology in infrastructure development in the village of Banjar is still encountered such as frequent discrepancies between the proposals submitted and reports made from the infrastructure development process (incompatibility of budget allocation for infrastructure development). Second, the strategy for rehabilitating bureaucratic pathology in infrastructure development that occurs by gradually monitoring each infrastructure development project that is being worked on, in collaboration with professional and competent construction parties.\",\"PeriodicalId\":193518,\"journal\":{\"name\":\"NeoRespublica: Jurnal Ilmu Pemerintahan\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"NeoRespublica: Jurnal Ilmu Pemerintahan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.52423/neores.v4i1.37\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"NeoRespublica: Jurnal Ilmu Pemerintahan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52423/neores.v4i1.37","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究运用官僚主义理论和官僚主义病理学来揭示在Banjar村基础设施发展的背景下,发生在村庄中的官僚主义病理学。本研究使用的基础是描述定性方法。本研究的结果是,首先,Banjar村基础设施发展中的官僚病理学现象仍然存在,如基础设施发展过程中提交的建议与报告之间经常存在差异(基础设施发展预算分配不相容)。第二,通过与专业和有能力的建设方合作,逐步监测正在进行的每个基础设施开发项目,从而恢复基础设施开发中的官僚主义病态的战略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Bureaucracy Pathology in Infrastructure Development of Banjar Village, Sampang Regency
This study used bureaucratic theory and bureaucratic pathology to reveal bureaucratic pathologies that occur in villages in the context of infrastructure development that often occurs in Banjar village. The basis of the research used is descriptive qualitative method. The results of this study, firstly, the phenomenon of bureaucratic pathology in infrastructure development in the village of Banjar is still encountered such as frequent discrepancies between the proposals submitted and reports made from the infrastructure development process (incompatibility of budget allocation for infrastructure development). Second, the strategy for rehabilitating bureaucratic pathology in infrastructure development that occurs by gradually monitoring each infrastructure development project that is being worked on, in collaboration with professional and competent construction parties.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信