{"title":"PEP-II高能环的现状及早期调试","authors":"U. Wienands, E. Reuter, P. Bellomo, A. Fisher, J. Gracia, R. Gray, M. Pietryka, T. Taylor, V. Bharadwaj, R. Iverson, A. Kulikov, J. Seeman, J. Turner, C. Belser, M. Zisman, S. Zholents","doi":"10.1109/PAC.1997.749627","DOIUrl":null,"url":null,"abstract":"The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now beginning beam commissioning. This report will address the status of the ring systems and our experience in commissioning the systems as well as the first beam running.","PeriodicalId":122662,"journal":{"name":"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Status and early commissioning of the PEP-II High Energy Ring\",\"authors\":\"U. Wienands, E. Reuter, P. Bellomo, A. Fisher, J. Gracia, R. Gray, M. Pietryka, T. Taylor, V. Bharadwaj, R. Iverson, A. Kulikov, J. Seeman, J. Turner, C. Belser, M. Zisman, S. Zholents\",\"doi\":\"10.1109/PAC.1997.749627\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now beginning beam commissioning. This report will address the status of the ring systems and our experience in commissioning the systems as well as the first beam running.\",\"PeriodicalId\":122662,\"journal\":{\"name\":\"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-05-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAC.1997.749627\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.1997.749627","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
PEP- ii b工厂高能环已在PEP隧道内建成。现在开始进行梁调试。本报告将介绍环系统的现状和我们在调试系统以及首次梁运行方面的经验。
Status and early commissioning of the PEP-II High Energy Ring
The High Energy Ring of the PEP-II B-Factory has been constructed in the PEP tunnel. It is now beginning beam commissioning. This report will address the status of the ring systems and our experience in commissioning the systems as well as the first beam running.