在报告环境中传递单元关系

R. Goodwin
{"title":"在报告环境中传递单元关系","authors":"R. Goodwin","doi":"10.1109/SECON.2007.342861","DOIUrl":null,"url":null,"abstract":"Consider the problem of tracking a survey's cost and progress. Management must monitor the costs of the survey on a routine basis to ensure that actual expenditures do not exceed the budgeted dollar amounts. Management must monitor the progress of the survey on a routine basis to ensure that work was completed on time. This paper discussed the automated reporting environment by which cost and progress can be monitored. Given that seven systems must be polled for the information and ten reports must be developed, it becomes difficult for the programmer to comprehend where the data originates for the cells in the reports. A somewhat simple means were developed to show the cell relationships with-in reports and between reports using a tree structure. Having the cell relationships in the requirements documentation eases the programming burden as well as tracing the final product back to the requirements and specifications.","PeriodicalId":423683,"journal":{"name":"Proceedings 2007 IEEE SoutheastCon","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-03-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Conveying cell relationships in a reporting environment\",\"authors\":\"R. Goodwin\",\"doi\":\"10.1109/SECON.2007.342861\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Consider the problem of tracking a survey's cost and progress. Management must monitor the costs of the survey on a routine basis to ensure that actual expenditures do not exceed the budgeted dollar amounts. Management must monitor the progress of the survey on a routine basis to ensure that work was completed on time. This paper discussed the automated reporting environment by which cost and progress can be monitored. Given that seven systems must be polled for the information and ten reports must be developed, it becomes difficult for the programmer to comprehend where the data originates for the cells in the reports. A somewhat simple means were developed to show the cell relationships with-in reports and between reports using a tree structure. Having the cell relationships in the requirements documentation eases the programming burden as well as tracing the final product back to the requirements and specifications.\",\"PeriodicalId\":423683,\"journal\":{\"name\":\"Proceedings 2007 IEEE SoutheastCon\",\"volume\":\"62 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-03-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings 2007 IEEE SoutheastCon\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SECON.2007.342861\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings 2007 IEEE SoutheastCon","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SECON.2007.342861","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

考虑跟踪调查的成本和进度的问题。管理部门必须定期监测调查的费用,以确保实际支出不超过预算的美元数额。管理层必须定期监察调查的进度,以确保工作按时完成。本文讨论了可以监控成本和进度的自动化报告环境。由于必须轮询7个系统来获取信息,并且必须开发10个报告,因此程序员很难理解报告中单元格的数据来自何处。开发了一种比较简单的方法来使用树形结构显示报表内部和报表之间的单元关系。在需求文档中拥有单元关系可以减轻编程负担,并将最终产品追溯到需求和规范。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Conveying cell relationships in a reporting environment
Consider the problem of tracking a survey's cost and progress. Management must monitor the costs of the survey on a routine basis to ensure that actual expenditures do not exceed the budgeted dollar amounts. Management must monitor the progress of the survey on a routine basis to ensure that work was completed on time. This paper discussed the automated reporting environment by which cost and progress can be monitored. Given that seven systems must be polled for the information and ten reports must be developed, it becomes difficult for the programmer to comprehend where the data originates for the cells in the reports. A somewhat simple means were developed to show the cell relationships with-in reports and between reports using a tree structure. Having the cell relationships in the requirements documentation eases the programming burden as well as tracing the final product back to the requirements and specifications.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信