JET活性气体处理系统(AGHS)的安装和非活动调试

J. Hemmerich, A. Bell, P. Boucquey, C. Caldwell-Nichols, P. Chuilon, F. Delvart, B. Grieveson, R. Haange, G. Jones, R. Lasser, M. Laveyry, J. Lupo, J. Mart, P. Milverton, J. Salanave, L. Serio, N. Skinner, R. Stagg, K. Walker, J. Yorkshades, A. Konstantellos, E. Kussel
{"title":"JET活性气体处理系统(AGHS)的安装和非活动调试","authors":"J. Hemmerich, A. Bell, P. Boucquey, C. Caldwell-Nichols, P. Chuilon, F. Delvart, B. Grieveson, R. Haange, G. Jones, R. Lasser, M. Laveyry, J. Lupo, J. Mart, P. Milverton, J. Salanave, L. Serio, N. Skinner, R. Stagg, K. Walker, J. Yorkshades, A. Konstantellos, E. Kussel","doi":"10.1109/SFE.1993.472789","DOIUrl":null,"url":null,"abstract":"The installation of all AGHS subsystems in compliance with a strict Quality Assurance Programme was completed in 1993. Installation was followed by end-to-end commissioning of signal and control loop connections to the Distributed Control System. Plant layout and function are described and results of process tests with hydrogen, deuterium and other test gases are presented. These tests have revealed some minor deficiencies on the subsystems for Cryogenic Distillation, Exhaust Detritiation and Impurity Processing which have been or are in the process of being resolved prior to commissioning with tritium, initially 3g of T/sub 2/, due to start in 1994.","PeriodicalId":387034,"journal":{"name":"15th IEEE/NPSS Symposium on Fusion Engineering - Supplement,","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-10-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Installation and inactive commissioning of the JET active gas handling system (AGHS)\",\"authors\":\"J. Hemmerich, A. Bell, P. Boucquey, C. Caldwell-Nichols, P. Chuilon, F. Delvart, B. Grieveson, R. Haange, G. Jones, R. Lasser, M. Laveyry, J. Lupo, J. Mart, P. Milverton, J. Salanave, L. Serio, N. Skinner, R. Stagg, K. Walker, J. Yorkshades, A. Konstantellos, E. Kussel\",\"doi\":\"10.1109/SFE.1993.472789\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The installation of all AGHS subsystems in compliance with a strict Quality Assurance Programme was completed in 1993. Installation was followed by end-to-end commissioning of signal and control loop connections to the Distributed Control System. Plant layout and function are described and results of process tests with hydrogen, deuterium and other test gases are presented. These tests have revealed some minor deficiencies on the subsystems for Cryogenic Distillation, Exhaust Detritiation and Impurity Processing which have been or are in the process of being resolved prior to commissioning with tritium, initially 3g of T/sub 2/, due to start in 1994.\",\"PeriodicalId\":387034,\"journal\":{\"name\":\"15th IEEE/NPSS Symposium on Fusion Engineering - Supplement,\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-10-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"15th IEEE/NPSS Symposium on Fusion Engineering - Supplement,\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SFE.1993.472789\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"15th IEEE/NPSS Symposium on Fusion Engineering - Supplement,","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SFE.1993.472789","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

按照严格的质量保证计划,所有AGHS子系统的安装工作已于1993年完成。安装之后,端到端调试信号和控制回路连接到分布式控制系统。介绍了装置的布置和功能,并介绍了氢、氘和其他试验气体的工艺试验结果。这些试验揭示了低温蒸馏、排气除臭和杂质处理子系统上的一些小缺陷,这些缺陷在氚试运行之前已经或正在解决,最初是T/sub / 2的3g,定于1994年开始。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Installation and inactive commissioning of the JET active gas handling system (AGHS)
The installation of all AGHS subsystems in compliance with a strict Quality Assurance Programme was completed in 1993. Installation was followed by end-to-end commissioning of signal and control loop connections to the Distributed Control System. Plant layout and function are described and results of process tests with hydrogen, deuterium and other test gases are presented. These tests have revealed some minor deficiencies on the subsystems for Cryogenic Distillation, Exhaust Detritiation and Impurity Processing which have been or are in the process of being resolved prior to commissioning with tritium, initially 3g of T/sub 2/, due to start in 1994.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信