全球首次开发和部署一种独特设计的防喷器

Mustafa Buali, Mustafa R. Al-Zaid, Thamer Abdulghaffar, B. Gallagher
{"title":"全球首次开发和部署一种独特设计的防喷器","authors":"Mustafa Buali, Mustafa R. Al-Zaid, Thamer Abdulghaffar, B. Gallagher","doi":"10.2523/iptc-23023-ea","DOIUrl":null,"url":null,"abstract":"\n With the increasing challenges in gas well interventions, especially with the need to intervene in wells with extreme sour gases called \"high and ultra-high H2S wells,\" it became vital to have improved safety standards; including, but not limited to, pressure control equipment (PCE). Also, it became necessary to add an extra barrier to shear and seal under any conditions to safeguard against the risk of such toxic release. This improvement and new additional capability have been achieved by developing and successfully deploying a new technology for high risk completion and intervention applications.\n This new blowout stopper is an electrically initiated, pyro-mechanical gate valve that performs the critical function of shearing and sealing during drilling, completions and intervention operations. It may be added to the stack or retrofitted to an existing blowout preventer (BOP) cavity. The new BOP is designed to shear anything above the bit and seal instantly even after full flow has been established, with the ability to instantly and reliably stop the release of toxic sour gas regardless of what may be across the BOP. This technology is considered the industry's first true blowout \"stopper,\" as opposed to current \"preventers.\"\n The working components of this BOP are isolated from the wellbore fluids before activation to provide unmatched component integrity. In an emergency, such as a work string bottom-hole assembly (BHA) stuck across the BOP, it can shear anything and seal instantly to avert a potentially devastating release of toxic sour gas.\n This technology has gone through an extensive qualification program on an international scale. This program was designed to satisfy well control manual requirements, API 16A PR2 and DNVGL-OS-E101. All applicable tests were witnessed and approved by oil and gas well intervention specialists in both the field and yard tests. This paper will describe the technology in greater detail, and talk about the qualification program, including the yard test and first worldwide field trial testing.","PeriodicalId":283978,"journal":{"name":"Day 1 Wed, March 01, 2023","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"First Worldwide Development and Deployment of a Uniquely Designed Blowout Stopper\",\"authors\":\"Mustafa Buali, Mustafa R. Al-Zaid, Thamer Abdulghaffar, B. Gallagher\",\"doi\":\"10.2523/iptc-23023-ea\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n With the increasing challenges in gas well interventions, especially with the need to intervene in wells with extreme sour gases called \\\"high and ultra-high H2S wells,\\\" it became vital to have improved safety standards; including, but not limited to, pressure control equipment (PCE). Also, it became necessary to add an extra barrier to shear and seal under any conditions to safeguard against the risk of such toxic release. This improvement and new additional capability have been achieved by developing and successfully deploying a new technology for high risk completion and intervention applications.\\n This new blowout stopper is an electrically initiated, pyro-mechanical gate valve that performs the critical function of shearing and sealing during drilling, completions and intervention operations. It may be added to the stack or retrofitted to an existing blowout preventer (BOP) cavity. The new BOP is designed to shear anything above the bit and seal instantly even after full flow has been established, with the ability to instantly and reliably stop the release of toxic sour gas regardless of what may be across the BOP. This technology is considered the industry's first true blowout \\\"stopper,\\\" as opposed to current \\\"preventers.\\\"\\n The working components of this BOP are isolated from the wellbore fluids before activation to provide unmatched component integrity. In an emergency, such as a work string bottom-hole assembly (BHA) stuck across the BOP, it can shear anything and seal instantly to avert a potentially devastating release of toxic sour gas.\\n This technology has gone through an extensive qualification program on an international scale. This program was designed to satisfy well control manual requirements, API 16A PR2 and DNVGL-OS-E101. All applicable tests were witnessed and approved by oil and gas well intervention specialists in both the field and yard tests. This paper will describe the technology in greater detail, and talk about the qualification program, including the yard test and first worldwide field trial testing.\",\"PeriodicalId\":283978,\"journal\":{\"name\":\"Day 1 Wed, March 01, 2023\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Wed, March 01, 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/iptc-23023-ea\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Wed, March 01, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-23023-ea","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着气井修井面临的挑战越来越多,特别是需要修井的极端含硫气体,即“高和超高H2S井”,因此提高安全标准变得至关重要;包括但不限于压力控制设备(PCE)。此外,有必要在任何条件下增加一个额外的剪切和密封屏障,以防止这种有毒物质释放的风险。这种改进和新的附加功能是通过开发和成功部署用于高风险完井和修井作业的新技术实现的。这种新型防喷阀是一种电动启动的高温机械闸阀,在钻井、完井和修井作业中起着剪切和密封的关键作用。它可以添加到堆栈中,也可以改造到现有的防喷器(BOP)腔中。新型防喷器可以剪切钻头上方的任何东西,即使在建立满流量后也能立即密封,无论防喷器上有什么,都能立即可靠地阻止有毒酸性气体的释放。该技术被认为是业内第一个真正意义上的井喷“堵塞器”,而不是目前的“防喷器”。该防喷器的工作组件在激活前与井筒流体隔离,以提供无与伦比的组件完整性。在紧急情况下,如工作管柱底部钻具组合(BHA)卡在防喷器上,它可以剪切任何东西并立即密封,以避免有毒酸性气体的潜在破坏性释放。这项技术已经在国际范围内通过了广泛的认证程序。该程序旨在满足井控手册的要求,API 16A PR2和DNVGL-OS-E101。所有适用的测试都由现场和现场测试的油气井干预专家见证和批准。本文将更详细地描述该技术,并讨论鉴定程序,包括现场试验和首次全球现场试验。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
First Worldwide Development and Deployment of a Uniquely Designed Blowout Stopper
With the increasing challenges in gas well interventions, especially with the need to intervene in wells with extreme sour gases called "high and ultra-high H2S wells," it became vital to have improved safety standards; including, but not limited to, pressure control equipment (PCE). Also, it became necessary to add an extra barrier to shear and seal under any conditions to safeguard against the risk of such toxic release. This improvement and new additional capability have been achieved by developing and successfully deploying a new technology for high risk completion and intervention applications. This new blowout stopper is an electrically initiated, pyro-mechanical gate valve that performs the critical function of shearing and sealing during drilling, completions and intervention operations. It may be added to the stack or retrofitted to an existing blowout preventer (BOP) cavity. The new BOP is designed to shear anything above the bit and seal instantly even after full flow has been established, with the ability to instantly and reliably stop the release of toxic sour gas regardless of what may be across the BOP. This technology is considered the industry's first true blowout "stopper," as opposed to current "preventers." The working components of this BOP are isolated from the wellbore fluids before activation to provide unmatched component integrity. In an emergency, such as a work string bottom-hole assembly (BHA) stuck across the BOP, it can shear anything and seal instantly to avert a potentially devastating release of toxic sour gas. This technology has gone through an extensive qualification program on an international scale. This program was designed to satisfy well control manual requirements, API 16A PR2 and DNVGL-OS-E101. All applicable tests were witnessed and approved by oil and gas well intervention specialists in both the field and yard tests. This paper will describe the technology in greater detail, and talk about the qualification program, including the yard test and first worldwide field trial testing.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信