A. Damdoum, I. Slama-Belkhodja, M. Debbou, M. Pietrzak-David
{"title":"平衡电网故障下双馈感应电机抽水蓄能机组控制重构策略","authors":"A. Damdoum, I. Slama-Belkhodja, M. Debbou, M. Pietrzak-David","doi":"10.1109/CISTEM.2014.7076981","DOIUrl":null,"url":null,"abstract":"This paper proposes a reconfiguration scheme of a control strategy for a Doubly Fed Induction Machine based pump turbine system under balanced grid faults. The start-up and synchronization procedures are initially achieved before pump or turbine mode, with a different control at each of these three working zones. A control reconfiguration method is proposed when balanced grid faults occur during pumping mode. The reconfiguration is performed into two steps. Firstly, the control is switched from the pumping mode one to the control used for synchronization. The second step is to return to the pumping mode. The first step allows the pumping mode control parameters to be adapted to the faulty grid conditions. Study Simulations are carried out on a 4kW laboratory set-up to illustrate the effectiveness of the proposed approach.","PeriodicalId":115632,"journal":{"name":"2014 International Conference on Electrical Sciences and Technologies in Maghreb (CISTEM)","volume":"434 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Control reconfiguration strategy for Doubly Fed Induction Machine pumped storage unit under balanced grid faults\",\"authors\":\"A. Damdoum, I. Slama-Belkhodja, M. Debbou, M. Pietrzak-David\",\"doi\":\"10.1109/CISTEM.2014.7076981\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper proposes a reconfiguration scheme of a control strategy for a Doubly Fed Induction Machine based pump turbine system under balanced grid faults. The start-up and synchronization procedures are initially achieved before pump or turbine mode, with a different control at each of these three working zones. A control reconfiguration method is proposed when balanced grid faults occur during pumping mode. The reconfiguration is performed into two steps. Firstly, the control is switched from the pumping mode one to the control used for synchronization. The second step is to return to the pumping mode. The first step allows the pumping mode control parameters to be adapted to the faulty grid conditions. Study Simulations are carried out on a 4kW laboratory set-up to illustrate the effectiveness of the proposed approach.\",\"PeriodicalId\":115632,\"journal\":{\"name\":\"2014 International Conference on Electrical Sciences and Technologies in Maghreb (CISTEM)\",\"volume\":\"434 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 International Conference on Electrical Sciences and Technologies in Maghreb (CISTEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CISTEM.2014.7076981\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 International Conference on Electrical Sciences and Technologies in Maghreb (CISTEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CISTEM.2014.7076981","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Control reconfiguration strategy for Doubly Fed Induction Machine pumped storage unit under balanced grid faults
This paper proposes a reconfiguration scheme of a control strategy for a Doubly Fed Induction Machine based pump turbine system under balanced grid faults. The start-up and synchronization procedures are initially achieved before pump or turbine mode, with a different control at each of these three working zones. A control reconfiguration method is proposed when balanced grid faults occur during pumping mode. The reconfiguration is performed into two steps. Firstly, the control is switched from the pumping mode one to the control used for synchronization. The second step is to return to the pumping mode. The first step allows the pumping mode control parameters to be adapted to the faulty grid conditions. Study Simulations are carried out on a 4kW laboratory set-up to illustrate the effectiveness of the proposed approach.