阿曼电力供应战略规划,包括风能考虑

A. Malik, C. Kuba
{"title":"阿曼电力供应战略规划,包括风能考虑","authors":"A. Malik, C. Kuba","doi":"10.1109/AFRCON.2013.6757816","DOIUrl":null,"url":null,"abstract":"Many options can be effectively used to meet the future power needs of a country in ways which would be more economically viable, environmentally sound, and socially just. A least-cost generation expansion planning study is conducted to find the economic feasibility of large scale integration of wind farms in Main interconnected transmission system of Oman. The generation expansion planning software used is WASP which is restricted in its capability to model intermittent nature of wind. Therefore, a wind turbine is modeled as a thermal plant with high forced outage rate related to its capacity factor. The result of the study has shown that wind turbines forms as part of the overall least-cost generation expansion plan for Main Interconnected System of Oman.","PeriodicalId":159306,"journal":{"name":"2013 Africon","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Strategic planning of power supply in Oman including wind energy considerations\",\"authors\":\"A. Malik, C. Kuba\",\"doi\":\"10.1109/AFRCON.2013.6757816\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Many options can be effectively used to meet the future power needs of a country in ways which would be more economically viable, environmentally sound, and socially just. A least-cost generation expansion planning study is conducted to find the economic feasibility of large scale integration of wind farms in Main interconnected transmission system of Oman. The generation expansion planning software used is WASP which is restricted in its capability to model intermittent nature of wind. Therefore, a wind turbine is modeled as a thermal plant with high forced outage rate related to its capacity factor. The result of the study has shown that wind turbines forms as part of the overall least-cost generation expansion plan for Main Interconnected System of Oman.\",\"PeriodicalId\":159306,\"journal\":{\"name\":\"2013 Africon\",\"volume\":\"51 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 Africon\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AFRCON.2013.6757816\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 Africon","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AFRCON.2013.6757816","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

许多选择可以有效地用来满足一个国家未来的电力需求,这些方式在经济上更可行,环境上更无害,社会上更公正。为寻找阿曼主互联输电系统大规模整合风电场的经济可行性,进行了最低成本发电扩展规划研究。所使用的发电扩展规划软件是WASP,它在模拟风的间歇性特性方面受到限制。因此,风力发电机组被建模为与容量因子相关的高强制停运率的热电厂。研究结果表明,风力涡轮机是阿曼主要互联系统整体最低成本发电扩展计划的一部分。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Strategic planning of power supply in Oman including wind energy considerations
Many options can be effectively used to meet the future power needs of a country in ways which would be more economically viable, environmentally sound, and socially just. A least-cost generation expansion planning study is conducted to find the economic feasibility of large scale integration of wind farms in Main interconnected transmission system of Oman. The generation expansion planning software used is WASP which is restricted in its capability to model intermittent nature of wind. Therefore, a wind turbine is modeled as a thermal plant with high forced outage rate related to its capacity factor. The result of the study has shown that wind turbines forms as part of the overall least-cost generation expansion plan for Main Interconnected System of Oman.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信