暂态残余电压对动态负载传递的影响

F. Băiceanu, F. Munteanu, C. Nemeş
{"title":"暂态残余电压对动态负载传递的影响","authors":"F. Băiceanu, F. Munteanu, C. Nemeş","doi":"10.2478/bipie-2021-0022","DOIUrl":null,"url":null,"abstract":"Abstract The successful operation of back-up supply sources in the case of dynamic loads transfer in industrial electricity supply installation is mainly depending on the mitigation of the residual voltage that appears in fault scenarios that result in losing supply from the main grid. The decrease of the interval of presence of residual bus voltage depends highly on the local load and the network configuration. A high time constant (seconds) of the decreasing residual voltage can lead to the disconnection of critical consumers. In this paper, it is presented a simple, cost-effective method for dynamic load transfer that can replace the Motor Bus Transfer approach. The validity of the method is tested on a real large industrial site from Romania. The case study shows that the proposed approach can achieve a voltage return time of around 750 ms.","PeriodicalId":330949,"journal":{"name":"Bulletin of the Polytechnic Institute of Iași. Electrical Engineering, Power Engineering, Electronics Section","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Transient Residual Voltage Influence on the Dynamic Load Transfer\",\"authors\":\"F. Băiceanu, F. Munteanu, C. Nemeş\",\"doi\":\"10.2478/bipie-2021-0022\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The successful operation of back-up supply sources in the case of dynamic loads transfer in industrial electricity supply installation is mainly depending on the mitigation of the residual voltage that appears in fault scenarios that result in losing supply from the main grid. The decrease of the interval of presence of residual bus voltage depends highly on the local load and the network configuration. A high time constant (seconds) of the decreasing residual voltage can lead to the disconnection of critical consumers. In this paper, it is presented a simple, cost-effective method for dynamic load transfer that can replace the Motor Bus Transfer approach. The validity of the method is tested on a real large industrial site from Romania. The case study shows that the proposed approach can achieve a voltage return time of around 750 ms.\",\"PeriodicalId\":330949,\"journal\":{\"name\":\"Bulletin of the Polytechnic Institute of Iași. Electrical Engineering, Power Engineering, Electronics Section\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of the Polytechnic Institute of Iași. Electrical Engineering, Power Engineering, Electronics Section\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/bipie-2021-0022\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of the Polytechnic Institute of Iași. Electrical Engineering, Power Engineering, Electronics Section","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/bipie-2021-0022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要在工业供电装置中,在动态负荷转移的情况下,备用电源的成功运行主要取决于在故障情况下出现的残余电压的缓解,从而导致主电网的供电中断。剩余母线电压出现间隔的减小很大程度上取决于本地负载和网络配置。残余电压下降的高时间常数(秒)可能导致关键用户断开。本文提出了一种简单、经济的动态载荷转移方法,可以代替汽车转移方法。该方法的有效性在罗马尼亚的一个大型工业现场进行了测试。实例研究表明,该方法可以实现750 ms左右的电压返回时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Transient Residual Voltage Influence on the Dynamic Load Transfer
Abstract The successful operation of back-up supply sources in the case of dynamic loads transfer in industrial electricity supply installation is mainly depending on the mitigation of the residual voltage that appears in fault scenarios that result in losing supply from the main grid. The decrease of the interval of presence of residual bus voltage depends highly on the local load and the network configuration. A high time constant (seconds) of the decreasing residual voltage can lead to the disconnection of critical consumers. In this paper, it is presented a simple, cost-effective method for dynamic load transfer that can replace the Motor Bus Transfer approach. The validity of the method is tested on a real large industrial site from Romania. The case study shows that the proposed approach can achieve a voltage return time of around 750 ms.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信