建筑公司经济财务指标指标的风险分析

A. Lima, Nilton César Lima, G. Souza, V. F. Martins
{"title":"建筑公司经济财务指标指标的风险分析","authors":"A. Lima, Nilton César Lima, G. Souza, V. F. Martins","doi":"10.18227/2237-8057RARR.V6I1.2940","DOIUrl":null,"url":null,"abstract":"The construction companies that choose to participate in the execution of public works are exposed to various risks while performing their activities. Many of these works are paralyzed due to the fact that companies cannot afford the high costs of their implementation. Given this fact, this study sought to identify, through the analysis of the financial statements of the heavy construction companies listed on Bovespa, the risks to which these contractors are exposed. It was possible to note that companies that perform this type of activity must deal with many factors that go beyond their control, as well as with the high complexity of the activity itself. It was determined that several companies that fit this context suffer from liquidity problems and experience a negative impact on their profits. These problems are due mainly to the delinquency of governments and public institutions, undermining the operating cycle of the contractors. It was identified that the main risks for heavy construction companies are the constant delays in the transfer of funds, as well as the non-payment of these, added to the difficulties imposed on the managers of these companies, who have to deal with a longer operating cycle and the execution of an activity with a high degree of complexity.","PeriodicalId":415927,"journal":{"name":"Revista de Administração de Roraima","volume":"69 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANÁLISE DOS RISCOS NA MÉTRICA DE INDICADORES ECONÔMICO-FINANCEIROS DAS EMPRESAS DE CONSTRUÇÃO\",\"authors\":\"A. Lima, Nilton César Lima, G. Souza, V. F. Martins\",\"doi\":\"10.18227/2237-8057RARR.V6I1.2940\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction companies that choose to participate in the execution of public works are exposed to various risks while performing their activities. Many of these works are paralyzed due to the fact that companies cannot afford the high costs of their implementation. Given this fact, this study sought to identify, through the analysis of the financial statements of the heavy construction companies listed on Bovespa, the risks to which these contractors are exposed. It was possible to note that companies that perform this type of activity must deal with many factors that go beyond their control, as well as with the high complexity of the activity itself. It was determined that several companies that fit this context suffer from liquidity problems and experience a negative impact on their profits. These problems are due mainly to the delinquency of governments and public institutions, undermining the operating cycle of the contractors. It was identified that the main risks for heavy construction companies are the constant delays in the transfer of funds, as well as the non-payment of these, added to the difficulties imposed on the managers of these companies, who have to deal with a longer operating cycle and the execution of an activity with a high degree of complexity.\",\"PeriodicalId\":415927,\"journal\":{\"name\":\"Revista de Administração de Roraima\",\"volume\":\"69 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-08-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Revista de Administração de Roraima\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18227/2237-8057RARR.V6I1.2940\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Revista de Administração de Roraima","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18227/2237-8057RARR.V6I1.2940","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

选择参与公共工程执行的建筑公司在进行活动时面临着各种风险。由于公司无法承担实施这些项目的高昂成本,这些项目中的许多都陷入了瘫痪。鉴于这一事实,本研究试图通过分析在Bovespa上市的重型建筑公司的财务报表来确定这些承包商面临的风险。值得注意的是,执行此类活动的公司必须处理许多超出其控制范围的因素,以及活动本身的高度复杂性。据确定,符合这种情况的几家公司面临流动性问题,并对其利润产生负面影响。这些问题主要是由于政府和公共机构的失职,破坏了承包商的经营周期。经查明,大型建筑公司的主要风险是资金的转移不断拖延,以及不支付这些资金,这增加了这些公司的管理人员所面临的困难,他们必须处理较长的业务周期和执行高度复杂的活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANÁLISE DOS RISCOS NA MÉTRICA DE INDICADORES ECONÔMICO-FINANCEIROS DAS EMPRESAS DE CONSTRUÇÃO
The construction companies that choose to participate in the execution of public works are exposed to various risks while performing their activities. Many of these works are paralyzed due to the fact that companies cannot afford the high costs of their implementation. Given this fact, this study sought to identify, through the analysis of the financial statements of the heavy construction companies listed on Bovespa, the risks to which these contractors are exposed. It was possible to note that companies that perform this type of activity must deal with many factors that go beyond their control, as well as with the high complexity of the activity itself. It was determined that several companies that fit this context suffer from liquidity problems and experience a negative impact on their profits. These problems are due mainly to the delinquency of governments and public institutions, undermining the operating cycle of the contractors. It was identified that the main risks for heavy construction companies are the constant delays in the transfer of funds, as well as the non-payment of these, added to the difficulties imposed on the managers of these companies, who have to deal with a longer operating cycle and the execution of an activity with a high degree of complexity.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信