{"title":"走向一个完整的面向项目的风险管理模型:PRORISK的细化","authors":"Boriwat Suebkuna, Sakgasit Ramingwong","doi":"10.1109/JCSSE.2011.5930146","DOIUrl":null,"url":null,"abstract":"PRORSK is a conceptual model which was developed to simultaneously address importance of project management and risk management in software projects. This paper further refines this model by incorporating insights from experienced Thai software engineers, resulting in a more complete and practical project oriented risk management model which can be further applied in standard software projects.","PeriodicalId":287775,"journal":{"name":"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Towards a complete project oriented risk management model: A refinement of PRORISK\",\"authors\":\"Boriwat Suebkuna, Sakgasit Ramingwong\",\"doi\":\"10.1109/JCSSE.2011.5930146\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PRORSK is a conceptual model which was developed to simultaneously address importance of project management and risk management in software projects. This paper further refines this model by incorporating insights from experienced Thai software engineers, resulting in a more complete and practical project oriented risk management model which can be further applied in standard software projects.\",\"PeriodicalId\":287775,\"journal\":{\"name\":\"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/JCSSE.2011.5930146\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JCSSE.2011.5930146","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

prosk是一个概念模型,它是为了同时解决软件项目中项目管理和风险管理的重要性而开发的。本文通过结合经验丰富的泰国软件工程师的见解,进一步细化了这个模型,形成了一个更完整、更实用的面向项目的风险管理模型,可以进一步应用于标准的软件项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Towards a complete project oriented risk management model: A refinement of PRORISK
PRORSK is a conceptual model which was developed to simultaneously address importance of project management and risk management in software projects. This paper further refines this model by incorporating insights from experienced Thai software engineers, resulting in a more complete and practical project oriented risk management model which can be further applied in standard software projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信