{"title":"走向一个完整的面向项目的风险管理模型:PRORISK的细化","authors":"Boriwat Suebkuna, Sakgasit Ramingwong","doi":"10.1109/JCSSE.2011.5930146","DOIUrl":null,"url":null,"abstract":"PRORSK is a conceptual model which was developed to simultaneously address importance of project management and risk management in software projects. This paper further refines this model by incorporating insights from experienced Thai software engineers, resulting in a more complete and practical project oriented risk management model which can be further applied in standard software projects.","PeriodicalId":287775,"journal":{"name":"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Towards a complete project oriented risk management model: A refinement of PRORISK\",\"authors\":\"Boriwat Suebkuna, Sakgasit Ramingwong\",\"doi\":\"10.1109/JCSSE.2011.5930146\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PRORSK is a conceptual model which was developed to simultaneously address importance of project management and risk management in software projects. This paper further refines this model by incorporating insights from experienced Thai software engineers, resulting in a more complete and practical project oriented risk management model which can be further applied in standard software projects.\",\"PeriodicalId\":287775,\"journal\":{\"name\":\"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/JCSSE.2011.5930146\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Eighth International Joint Conference on Computer Science and Software Engineering (JCSSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JCSSE.2011.5930146","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Towards a complete project oriented risk management model: A refinement of PRORISK
PRORSK is a conceptual model which was developed to simultaneously address importance of project management and risk management in software projects. This paper further refines this model by incorporating insights from experienced Thai software engineers, resulting in a more complete and practical project oriented risk management model which can be further applied in standard software projects.