{"title":"量化非抢占调度的精确次优性","authors":"Robert I. Davis, Abhilash Thekkilakattil, Oliver Gettings, R. Dobrin, S. Punnekkat","doi":"10.1109/RTSS.2015.17","DOIUrl":null,"url":null,"abstract":"Fixed priority scheduling is used in many real-time systems, however, both preemptive and non-preemptive variants (FP-P and FP-NP) are known to be sub-optimal when compared to an optimal uniprocessor scheduling algorithm such as preemptive Earliest Deadline First (EDF-P). In this paper, we investigate the sub-optimality of fixed priority non-preemptive scheduling. Specifically, we derive the exact processor speed-up factor required to guarantee the feasibility under FP-NP (i.e. schedulablability assuming an optimal priority assignment) of any task set that is feasible under EDF-P. As a consequence of this work, we also derive a lower bound on the sub-optimality of non-preemptive EDF (EDF-NP), which since it matches a recently published upper bound gives the exact sub-optimality for EDF-NP. It is known that neither preemptive, nor non-preemptive fixed priority scheduling dominates the other, i.e., there are task sets that are feasible on a processor of unit speed under FP-P that are not feasible under FP-NP and vice-versa. Hence comparing these two algorithms, there are non-trivial speedup factors in both directions. We derive the exact speed-up factor required to guarantee the FP-NP feasibility of any FP-P feasible task set. Further, we derive upper and lower bounds on the speed-up factor required to guarantee FP-P feasibility of any FP-NP feasible task set. Empirical evidence suggests that the lower bound may be tight, and hence equate to the exact speed-up factor in this case.","PeriodicalId":239882,"journal":{"name":"2015 IEEE Real-Time Systems Symposium","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":"{\"title\":\"Quantifying the Exact Sub-optimality of Non-preemptive Scheduling\",\"authors\":\"Robert I. Davis, Abhilash Thekkilakattil, Oliver Gettings, R. Dobrin, S. Punnekkat\",\"doi\":\"10.1109/RTSS.2015.17\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Fixed priority scheduling is used in many real-time systems, however, both preemptive and non-preemptive variants (FP-P and FP-NP) are known to be sub-optimal when compared to an optimal uniprocessor scheduling algorithm such as preemptive Earliest Deadline First (EDF-P). In this paper, we investigate the sub-optimality of fixed priority non-preemptive scheduling. Specifically, we derive the exact processor speed-up factor required to guarantee the feasibility under FP-NP (i.e. schedulablability assuming an optimal priority assignment) of any task set that is feasible under EDF-P. As a consequence of this work, we also derive a lower bound on the sub-optimality of non-preemptive EDF (EDF-NP), which since it matches a recently published upper bound gives the exact sub-optimality for EDF-NP. It is known that neither preemptive, nor non-preemptive fixed priority scheduling dominates the other, i.e., there are task sets that are feasible on a processor of unit speed under FP-P that are not feasible under FP-NP and vice-versa. Hence comparing these two algorithms, there are non-trivial speedup factors in both directions. We derive the exact speed-up factor required to guarantee the FP-NP feasibility of any FP-P feasible task set. Further, we derive upper and lower bounds on the speed-up factor required to guarantee FP-P feasibility of any FP-NP feasible task set. Empirical evidence suggests that the lower bound may be tight, and hence equate to the exact speed-up factor in this case.\",\"PeriodicalId\":239882,\"journal\":{\"name\":\"2015 IEEE Real-Time Systems Symposium\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"14\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE Real-Time Systems Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RTSS.2015.17\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Real-Time Systems Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RTSS.2015.17","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

摘要

固定优先级调度在许多实时系统中使用,然而,与最优单处理器调度算法(如抢占式最早截止日期优先(EDF-P))相比,已知抢占式和非抢占式变体(FP-P和FP-NP)都是次优的。本文研究了固定优先级非抢占调度的次优性问题。具体地说,我们推导了在EDF-P下可行的任何任务集在FP-NP(即假设最优优先级分配的可调度性)下的可行性所需的确切处理器加速因子。作为这项工作的结果,我们还推导了非抢占式EDF (EDF- np)次最优性的下界,由于它与最近发布的上界相匹配,因此给出了EDF- np的确切次最优性。已知抢占式固定优先级调度和非抢占式固定优先级调度都不占优势,即存在在FP-P下单位速度处理器上可行的任务集在FP-NP下不可行的任务集,反之亦然。因此,比较这两种算法,在两个方向上都有非平凡的加速因子。我们导出了保证任意FP-P可行任务集FP-NP可行性所需的精确加速因子。进一步,我们导出了保证任意FP-NP可行任务集FP-P可行性所需加速因子的上界和下界。经验证据表明,下限可能很紧,因此在这种情况下等同于确切的加速因子。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Quantifying the Exact Sub-optimality of Non-preemptive Scheduling
Fixed priority scheduling is used in many real-time systems, however, both preemptive and non-preemptive variants (FP-P and FP-NP) are known to be sub-optimal when compared to an optimal uniprocessor scheduling algorithm such as preemptive Earliest Deadline First (EDF-P). In this paper, we investigate the sub-optimality of fixed priority non-preemptive scheduling. Specifically, we derive the exact processor speed-up factor required to guarantee the feasibility under FP-NP (i.e. schedulablability assuming an optimal priority assignment) of any task set that is feasible under EDF-P. As a consequence of this work, we also derive a lower bound on the sub-optimality of non-preemptive EDF (EDF-NP), which since it matches a recently published upper bound gives the exact sub-optimality for EDF-NP. It is known that neither preemptive, nor non-preemptive fixed priority scheduling dominates the other, i.e., there are task sets that are feasible on a processor of unit speed under FP-P that are not feasible under FP-NP and vice-versa. Hence comparing these two algorithms, there are non-trivial speedup factors in both directions. We derive the exact speed-up factor required to guarantee the FP-NP feasibility of any FP-P feasible task set. Further, we derive upper and lower bounds on the speed-up factor required to guarantee FP-P feasibility of any FP-NP feasible task set. Empirical evidence suggests that the lower bound may be tight, and hence equate to the exact speed-up factor in this case.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信