钢筋制造中考虑切削工序的箕斗流车间调度研究

H. Arai, Harumi Haraguchi
{"title":"钢筋制造中考虑切削工序的箕斗流车间调度研究","authors":"H. Arai, Harumi Haraguchi","doi":"10.1109/IEEM44572.2019.8978565","DOIUrl":null,"url":null,"abstract":"In recent years, technical innovation is also expanded in the field of housing construction. The unit basic reinforcing rod system (BRS) is one of important innovation of “layout of reinforcement bar process” in the making of the housing base. This process was performed by handwork in the past, many housing construction sites are using BRS at now. The BRS is made in factory and production process are complicated. Therefore, the process systematization is behind. A manufacturing premise of BRS is regarded as a flow shop system that the lot sizing condition is different every process. In addition, the first process of BRS is a cutting process. It is also important for making of BRS. In this study, an efficient scheduling method is proposed using the priority of the lot sizing condition and a cutting process.","PeriodicalId":255418,"journal":{"name":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A Study on Skip Flow Shop Scheduling Considering with a Cutting Process in Reinforcing Bar Manufacturing\",\"authors\":\"H. Arai, Harumi Haraguchi\",\"doi\":\"10.1109/IEEM44572.2019.8978565\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In recent years, technical innovation is also expanded in the field of housing construction. The unit basic reinforcing rod system (BRS) is one of important innovation of “layout of reinforcement bar process” in the making of the housing base. This process was performed by handwork in the past, many housing construction sites are using BRS at now. The BRS is made in factory and production process are complicated. Therefore, the process systematization is behind. A manufacturing premise of BRS is regarded as a flow shop system that the lot sizing condition is different every process. In addition, the first process of BRS is a cutting process. It is also important for making of BRS. In this study, an efficient scheduling method is proposed using the priority of the lot sizing condition and a cutting process.\",\"PeriodicalId\":255418,\"journal\":{\"name\":\"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM44572.2019.8978565\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM44572.2019.8978565","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

近年来,技术创新也在住房建设领域得到拓展。单元基本配筋系统(BRS)是房屋基座制作中“配筋工艺布置”的重要创新之一。这一过程过去是手工完成的,现在很多房屋建筑工地都在使用BRS。BRS为工厂制造,生产工艺复杂。因此,过程系统化落后。将BRS的制造前提看作是一个每道工序的批量条件不同的流水车间系统。此外,BRS的第一道工序是切削工序。这对BRS的制作也很重要。本文提出了一种基于批量条件优先级和切削工艺的高效调度方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Study on Skip Flow Shop Scheduling Considering with a Cutting Process in Reinforcing Bar Manufacturing
In recent years, technical innovation is also expanded in the field of housing construction. The unit basic reinforcing rod system (BRS) is one of important innovation of “layout of reinforcement bar process” in the making of the housing base. This process was performed by handwork in the past, many housing construction sites are using BRS at now. The BRS is made in factory and production process are complicated. Therefore, the process systematization is behind. A manufacturing premise of BRS is regarded as a flow shop system that the lot sizing condition is different every process. In addition, the first process of BRS is a cutting process. It is also important for making of BRS. In this study, an efficient scheduling method is proposed using the priority of the lot sizing condition and a cutting process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信