{"title":"满足孟加拉国能源安全的可再生能源发电成本分析","authors":"Shakib Hassan Eon","doi":"10.46610/joares.2021.v07i03.002","DOIUrl":null,"url":null,"abstract":"Renewable energy generation is no more an alternative rather it becomes a choice for the power generation to meet the upcoming energy demand. Considering the non- renewable energy unavailability, as well as, the environmental impact, renewable energy should be the first choice. Most of the power generation in Bangladesh comes from nonrenewable energy and a noticeable amount of energy is imported from abroad. As a developing country, it is not cost-efficient and never ensures energy security. To ensure long-term energy security, it is time to shift power generation from nonrenewable to renewable energy generation. This paper presents an approximate calculation for the renewable power generating plant cost and returning year. The cost calculation is done in the context of Bangladesh.","PeriodicalId":270119,"journal":{"name":"Journal of Alternative and Renewable Energy Sources","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Cost Analysis for the Renewable Energy Generation to meet the Energy Security in Bangladesh\",\"authors\":\"Shakib Hassan Eon\",\"doi\":\"10.46610/joares.2021.v07i03.002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Renewable energy generation is no more an alternative rather it becomes a choice for the power generation to meet the upcoming energy demand. Considering the non- renewable energy unavailability, as well as, the environmental impact, renewable energy should be the first choice. Most of the power generation in Bangladesh comes from nonrenewable energy and a noticeable amount of energy is imported from abroad. As a developing country, it is not cost-efficient and never ensures energy security. To ensure long-term energy security, it is time to shift power generation from nonrenewable to renewable energy generation. This paper presents an approximate calculation for the renewable power generating plant cost and returning year. The cost calculation is done in the context of Bangladesh.\",\"PeriodicalId\":270119,\"journal\":{\"name\":\"Journal of Alternative and Renewable Energy Sources\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Alternative and Renewable Energy Sources\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46610/joares.2021.v07i03.002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Alternative and Renewable Energy Sources","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46610/joares.2021.v07i03.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

可再生能源发电不再是一种替代,而是成为发电满足未来能源需求的一种选择。考虑到不可再生能源的不可用性,以及对环境的影响,可再生能源应该是首选。孟加拉国的大部分发电来自不可再生能源,还有相当数量的能源是从国外进口的。作为一个发展中国家,这既不划算,也永远无法保证能源安全。为了确保长期的能源安全,现在是将发电从不可再生能源转向可再生能源的时候了。本文给出了可再生能源发电机组成本和回收年的近似计算方法。成本计算是在孟加拉国的背景下进行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Cost Analysis for the Renewable Energy Generation to meet the Energy Security in Bangladesh
Renewable energy generation is no more an alternative rather it becomes a choice for the power generation to meet the upcoming energy demand. Considering the non- renewable energy unavailability, as well as, the environmental impact, renewable energy should be the first choice. Most of the power generation in Bangladesh comes from nonrenewable energy and a noticeable amount of energy is imported from abroad. As a developing country, it is not cost-efficient and never ensures energy security. To ensure long-term energy security, it is time to shift power generation from nonrenewable to renewable energy generation. This paper presents an approximate calculation for the renewable power generating plant cost and returning year. The cost calculation is done in the context of Bangladesh.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信