{"title":"一种创新的增强型建筑规划技术:分析与协作方法","authors":"Qais Amarkhil, E. Elwakil, B. Hubbard","doi":"10.1109/SusTech53338.2022.9794266","DOIUrl":null,"url":null,"abstract":"This paper presents an innovative enhanced planning technique and method. The proposed method consists of three phases: Master, Measured, and Production. This technique proactively assesses the inherent delay risk on a work schedule. Selecting the most suitable alternate option calculates the project schedule's time, location, and inherent criticalities indices. This method also can benchmark the project schedule's criticality and productivity internally within the phases of a project and externally between projects. Thus, the proposed technique helps improve productivity and mitigate delay risk through the project team's collaboration and assessing inherent delay risk. In addition, enhanced planning is integrable with other scheduling techniques to improve productivity and timely complete work. Applying this technique reduces wastes by streamlining work and decreasing unnecessary inventory on-site.","PeriodicalId":434652,"journal":{"name":"2022 IEEE Conference on Technologies for Sustainability (SusTech)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Innovative Enhanced Construction Planning Technique: Analytic & Collaborative Approach\",\"authors\":\"Qais Amarkhil, E. Elwakil, B. Hubbard\",\"doi\":\"10.1109/SusTech53338.2022.9794266\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an innovative enhanced planning technique and method. The proposed method consists of three phases: Master, Measured, and Production. This technique proactively assesses the inherent delay risk on a work schedule. Selecting the most suitable alternate option calculates the project schedule's time, location, and inherent criticalities indices. This method also can benchmark the project schedule's criticality and productivity internally within the phases of a project and externally between projects. Thus, the proposed technique helps improve productivity and mitigate delay risk through the project team's collaboration and assessing inherent delay risk. In addition, enhanced planning is integrable with other scheduling techniques to improve productivity and timely complete work. Applying this technique reduces wastes by streamlining work and decreasing unnecessary inventory on-site.\",\"PeriodicalId\":434652,\"journal\":{\"name\":\"2022 IEEE Conference on Technologies for Sustainability (SusTech)\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE Conference on Technologies for Sustainability (SusTech)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SusTech53338.2022.9794266\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE Conference on Technologies for Sustainability (SusTech)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SusTech53338.2022.9794266","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An Innovative Enhanced Construction Planning Technique: Analytic & Collaborative Approach
This paper presents an innovative enhanced planning technique and method. The proposed method consists of three phases: Master, Measured, and Production. This technique proactively assesses the inherent delay risk on a work schedule. Selecting the most suitable alternate option calculates the project schedule's time, location, and inherent criticalities indices. This method also can benchmark the project schedule's criticality and productivity internally within the phases of a project and externally between projects. Thus, the proposed technique helps improve productivity and mitigate delay risk through the project team's collaboration and assessing inherent delay risk. In addition, enhanced planning is integrable with other scheduling techniques to improve productivity and timely complete work. Applying this technique reduces wastes by streamlining work and decreasing unnecessary inventory on-site.