一种创新的增强型建筑规划技术:分析与协作方法

Qais Amarkhil, E. Elwakil, B. Hubbard
{"title":"一种创新的增强型建筑规划技术:分析与协作方法","authors":"Qais Amarkhil, E. Elwakil, B. Hubbard","doi":"10.1109/SusTech53338.2022.9794266","DOIUrl":null,"url":null,"abstract":"This paper presents an innovative enhanced planning technique and method. The proposed method consists of three phases: Master, Measured, and Production. This technique proactively assesses the inherent delay risk on a work schedule. Selecting the most suitable alternate option calculates the project schedule's time, location, and inherent criticalities indices. This method also can benchmark the project schedule's criticality and productivity internally within the phases of a project and externally between projects. Thus, the proposed technique helps improve productivity and mitigate delay risk through the project team's collaboration and assessing inherent delay risk. In addition, enhanced planning is integrable with other scheduling techniques to improve productivity and timely complete work. Applying this technique reduces wastes by streamlining work and decreasing unnecessary inventory on-site.","PeriodicalId":434652,"journal":{"name":"2022 IEEE Conference on Technologies for Sustainability (SusTech)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Innovative Enhanced Construction Planning Technique: Analytic & Collaborative Approach\",\"authors\":\"Qais Amarkhil, E. Elwakil, B. Hubbard\",\"doi\":\"10.1109/SusTech53338.2022.9794266\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an innovative enhanced planning technique and method. The proposed method consists of three phases: Master, Measured, and Production. This technique proactively assesses the inherent delay risk on a work schedule. Selecting the most suitable alternate option calculates the project schedule's time, location, and inherent criticalities indices. This method also can benchmark the project schedule's criticality and productivity internally within the phases of a project and externally between projects. Thus, the proposed technique helps improve productivity and mitigate delay risk through the project team's collaboration and assessing inherent delay risk. In addition, enhanced planning is integrable with other scheduling techniques to improve productivity and timely complete work. Applying this technique reduces wastes by streamlining work and decreasing unnecessary inventory on-site.\",\"PeriodicalId\":434652,\"journal\":{\"name\":\"2022 IEEE Conference on Technologies for Sustainability (SusTech)\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE Conference on Technologies for Sustainability (SusTech)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SusTech53338.2022.9794266\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE Conference on Technologies for Sustainability (SusTech)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SusTech53338.2022.9794266","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文提出了一种创新的强化规划技术和方法。该方法包括三个阶段:主控、测量和生产。该技术主动评估工作计划中固有的延迟风险。选择最合适的备选方案计算项目进度表的时间、地点和固有的关键性指数。该方法还可以在项目阶段的内部和项目之间的外部对项目进度的重要性和生产力进行基准测试。因此,建议的技术有助于提高生产力,并通过项目团队的协作和评估固有的延迟风险来减轻延迟风险。此外,增强的计划可与其他调度技术集成,以提高生产率并及时完成工作。应用这种技术可以通过简化工作和减少现场不必要的库存来减少浪费。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Innovative Enhanced Construction Planning Technique: Analytic & Collaborative Approach
This paper presents an innovative enhanced planning technique and method. The proposed method consists of three phases: Master, Measured, and Production. This technique proactively assesses the inherent delay risk on a work schedule. Selecting the most suitable alternate option calculates the project schedule's time, location, and inherent criticalities indices. This method also can benchmark the project schedule's criticality and productivity internally within the phases of a project and externally between projects. Thus, the proposed technique helps improve productivity and mitigate delay risk through the project team's collaboration and assessing inherent delay risk. In addition, enhanced planning is integrable with other scheduling techniques to improve productivity and timely complete work. Applying this technique reduces wastes by streamlining work and decreasing unnecessary inventory on-site.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信