利用电池储能系统进行负荷频率控制,实现可再生能源大规模渗透

H. Amano, Y. Oshiro, T. Kawakami, T. Inoue
{"title":"利用电池储能系统进行负荷频率控制,实现可再生能源大规模渗透","authors":"H. Amano, Y. Oshiro, T. Kawakami, T. Inoue","doi":"10.1109/ISGTEurope.2012.6465650","DOIUrl":null,"url":null,"abstract":"To utilize renewable energy (RE) sources and energy storage will be common key components in smart grid vision. In Japan, a large scale penetration of photovoltaic generation is promoted, and there is a concern about its influence on load frequency control (LFC). Utilization of battery energy storage system (BESS) for LFC is expected as one of the countermeasures against it. In this paper, area control error (ACE) assignment suitable for making effective use of both of existing LFC unit and BESS is investigated under large-scale RE penetration condition. It is verified through numerical dynamic simulations that a filter-based ACE assignment can reduce the required capacity of BESS compared with a proportional ACE assignment.","PeriodicalId":244881,"journal":{"name":"2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"36","resultStr":"{\"title\":\"Utilization of battery energy storage system for load frequency control toward large-scale renewable energy penetration\",\"authors\":\"H. Amano, Y. Oshiro, T. Kawakami, T. Inoue\",\"doi\":\"10.1109/ISGTEurope.2012.6465650\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To utilize renewable energy (RE) sources and energy storage will be common key components in smart grid vision. In Japan, a large scale penetration of photovoltaic generation is promoted, and there is a concern about its influence on load frequency control (LFC). Utilization of battery energy storage system (BESS) for LFC is expected as one of the countermeasures against it. In this paper, area control error (ACE) assignment suitable for making effective use of both of existing LFC unit and BESS is investigated under large-scale RE penetration condition. It is verified through numerical dynamic simulations that a filter-based ACE assignment can reduce the required capacity of BESS compared with a proportional ACE assignment.\",\"PeriodicalId\":244881,\"journal\":{\"name\":\"2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)\",\"volume\":\"68 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"36\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGTEurope.2012.6465650\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 3rd IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEurope.2012.6465650","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 36

摘要

利用可再生能源和能源存储将是智能电网愿景的共同关键组成部分。在日本,光伏发电正在大规模普及,其对负荷频率控制(LFC)的影响令人担忧。电池储能系统(BESS)的应用有望成为解决这一问题的对策之一。本文研究了大规模RE侵彻条件下,既能有效利用现有LFC机组又能有效利用BESS的面积控制误差分配问题。通过数值动态仿真验证了基于滤波器的ACE分配比比例ACE分配能降低BESS所需的容量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Utilization of battery energy storage system for load frequency control toward large-scale renewable energy penetration
To utilize renewable energy (RE) sources and energy storage will be common key components in smart grid vision. In Japan, a large scale penetration of photovoltaic generation is promoted, and there is a concern about its influence on load frequency control (LFC). Utilization of battery energy storage system (BESS) for LFC is expected as one of the countermeasures against it. In this paper, area control error (ACE) assignment suitable for making effective use of both of existing LFC unit and BESS is investigated under large-scale RE penetration condition. It is verified through numerical dynamic simulations that a filter-based ACE assignment can reduce the required capacity of BESS compared with a proportional ACE assignment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信