建造业及公制化

A. Chalabi, Frank E. Vanzler
{"title":"建造业及公制化","authors":"A. Chalabi, Frank E. Vanzler","doi":"10.1061/JCCEAZ.0001016","DOIUrl":null,"url":null,"abstract":"A national survey of architects, engineers, contractors, material suppliers and manufacturers is conducted to determine what they feel about conversion to the SI system of measurement. The respondents perceptions of the problems in planning and implementation, their estimated costs and schedules for conversion and their comments and solutions are summarized. No strong opposition to metrication was prevalent. Apprehension about conversion is caused by fear of added cost and difficulties in training labor, increased errors and psychological factors. Many felt however that these problems are short term. The designers and design/construct sectors are the most optimistic in their expectations. Smaller companies have no present plans for conversion while some large companies have significant experience in using the SI system. The majority expect conversion by 1990.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1982-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Construction Industries and Metrication\",\"authors\":\"A. Chalabi, Frank E. Vanzler\",\"doi\":\"10.1061/JCCEAZ.0001016\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A national survey of architects, engineers, contractors, material suppliers and manufacturers is conducted to determine what they feel about conversion to the SI system of measurement. The respondents perceptions of the problems in planning and implementation, their estimated costs and schedules for conversion and their comments and solutions are summarized. No strong opposition to metrication was prevalent. Apprehension about conversion is caused by fear of added cost and difficulties in training labor, increased errors and psychological factors. Many felt however that these problems are short term. The designers and design/construct sectors are the most optimistic in their expectations. Smaller companies have no present plans for conversion while some large companies have significant experience in using the SI system. The majority expect conversion by 1990.\",\"PeriodicalId\":271903,\"journal\":{\"name\":\"Journal of the Construction Division\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1982-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Construction Division\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/JCCEAZ.0001016\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Construction Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JCCEAZ.0001016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一项针对建筑师、工程师、承包商、材料供应商和制造商的全国性调查正在进行,以确定他们对转换为SI测量系统的感受。总结了受访者对计划和实施中的问题的看法,他们的估计成本和转换时间表以及他们的意见和解决方案。对公制化的强烈反对并不普遍。对转换的恐惧是由于担心增加培训劳动的成本和困难、错误增加和心理因素造成的。然而,许多人认为这些问题是短期的。设计师和设计/建造行业的预期最为乐观。较小的公司目前没有转换的计划,而一些大公司在使用SI系统方面有丰富的经验。大多数人预计到1990年将转变。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Construction Industries and Metrication
A national survey of architects, engineers, contractors, material suppliers and manufacturers is conducted to determine what they feel about conversion to the SI system of measurement. The respondents perceptions of the problems in planning and implementation, their estimated costs and schedules for conversion and their comments and solutions are summarized. No strong opposition to metrication was prevalent. Apprehension about conversion is caused by fear of added cost and difficulties in training labor, increased errors and psychological factors. Many felt however that these problems are short term. The designers and design/construct sectors are the most optimistic in their expectations. Smaller companies have no present plans for conversion while some large companies have significant experience in using the SI system. The majority expect conversion by 1990.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信