电力牵引频率——具体情况

B. Freeman
{"title":"电力牵引频率——具体情况","authors":"B. Freeman","doi":"10.1109/RRCON.1990.171668","DOIUrl":null,"url":null,"abstract":"With a recognized need to either rehabilitate and/or replace the largest 25 Hz system in the US (New York to Washington rail corridor), one is faced with technical, operational, economic and political issues. Highlights are presented of some of the major issues which bear on the question of which system, 25 Hz at 12 kV or 60 Hz at 25 kV, to adopt. The role played by the utilities is examined along with operational considerations. Economic considerations are also outlined.<<ETX>>","PeriodicalId":115410,"journal":{"name":"ASME/IEEE Joint Conference on Railroads","volume":"120 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Electric traction frequency-a specific case\",\"authors\":\"B. Freeman\",\"doi\":\"10.1109/RRCON.1990.171668\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With a recognized need to either rehabilitate and/or replace the largest 25 Hz system in the US (New York to Washington rail corridor), one is faced with technical, operational, economic and political issues. Highlights are presented of some of the major issues which bear on the question of which system, 25 Hz at 12 kV or 60 Hz at 25 kV, to adopt. The role played by the utilities is examined along with operational considerations. Economic considerations are also outlined.<<ETX>>\",\"PeriodicalId\":115410,\"journal\":{\"name\":\"ASME/IEEE Joint Conference on Railroads\",\"volume\":\"120 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASME/IEEE Joint Conference on Railroads\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RRCON.1990.171668\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASME/IEEE Joint Conference on Railroads","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RRCON.1990.171668","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

由于需要修复和/或更换美国最大的25赫兹系统(纽约到华盛顿的铁路走廊),人们面临着技术,运营,经济和政治问题。重点介绍了在12千伏时采用25赫兹还是25千伏时采用60赫兹这一问题上的一些主要问题。将考察公用事业所扮演的角色以及操作方面的考虑。经济方面的考虑也被概述。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Electric traction frequency-a specific case
With a recognized need to either rehabilitate and/or replace the largest 25 Hz system in the US (New York to Washington rail corridor), one is faced with technical, operational, economic and political issues. Highlights are presented of some of the major issues which bear on the question of which system, 25 Hz at 12 kV or 60 Hz at 25 kV, to adopt. The role played by the utilities is examined along with operational considerations. Economic considerations are also outlined.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信