克拉比文斯基水库建设时房地产对象地籍价值估算方法

Anastasiya V. Loginova, E. Fedulova, A. Rada, A. D. Kuznetsov
{"title":"克拉比文斯基水库建设时房地产对象地籍价值估算方法","authors":"Anastasiya V. Loginova, E. Fedulova, A. Rada, A. D. Kuznetsov","doi":"10.56199/dpcsebm.kjlp4508","DOIUrl":null,"url":null,"abstract":"The authorities of Kuzbass drew attention to the objects of the Krapivinsky hydroelectric complex in 2019 that is 30 years after the suspension of construction. It was decided to assess the environmental impact and choose one of the following options for completing the construction of the Krapivinskaya HPP on the Tom River: zero option (refusal of completion), refusal of completion with liquidation of unfinished construction objects, option of completion to the project parameters of 1976 and option based on the results of basic technical solutions development in 2021. The initiative to consider the possibility of completing for the Krapivinskaya HPP construction in the current socio-economic conditions prevailing in the region will not only become an important incentive to study the prospects for the development of the region, but will also determine the priorities for radically improving the state of natural surface waters and living conditions of the population. However, the design of a hydroelectric power plant is a process that requires a comprehensive assessment of objects that will be in the zone of its influence. Some of those objects are flooded real estate objects. In the course of the study, calculations for real estate objects (land plots and capital construction projects) that will be in the flood zone are presented at elevations of 175.0 m and 177.5 m above sea level in the Baltic Elevation System of 1977. This work presents the results of cadastral value assessment for the real estate that will be flooded.","PeriodicalId":422599,"journal":{"name":"Sustainable and Innovative Development in the Global Digital Age","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Methodology for estimating the cadastral value of real estate objects when creating the Krapivinsky reservoir\",\"authors\":\"Anastasiya V. Loginova, E. Fedulova, A. Rada, A. D. Kuznetsov\",\"doi\":\"10.56199/dpcsebm.kjlp4508\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The authorities of Kuzbass drew attention to the objects of the Krapivinsky hydroelectric complex in 2019 that is 30 years after the suspension of construction. It was decided to assess the environmental impact and choose one of the following options for completing the construction of the Krapivinskaya HPP on the Tom River: zero option (refusal of completion), refusal of completion with liquidation of unfinished construction objects, option of completion to the project parameters of 1976 and option based on the results of basic technical solutions development in 2021. The initiative to consider the possibility of completing for the Krapivinskaya HPP construction in the current socio-economic conditions prevailing in the region will not only become an important incentive to study the prospects for the development of the region, but will also determine the priorities for radically improving the state of natural surface waters and living conditions of the population. However, the design of a hydroelectric power plant is a process that requires a comprehensive assessment of objects that will be in the zone of its influence. Some of those objects are flooded real estate objects. In the course of the study, calculations for real estate objects (land plots and capital construction projects) that will be in the flood zone are presented at elevations of 175.0 m and 177.5 m above sea level in the Baltic Elevation System of 1977. This work presents the results of cadastral value assessment for the real estate that will be flooded.\",\"PeriodicalId\":422599,\"journal\":{\"name\":\"Sustainable and Innovative Development in the Global Digital Age\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sustainable and Innovative Development in the Global Digital Age\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56199/dpcsebm.kjlp4508\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainable and Innovative Development in the Global Digital Age","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56199/dpcsebm.kjlp4508","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

库兹巴斯当局在暂停建设30年后的2019年提请人们注意克拉皮文斯基水电站的目标。决定评估环境影响并选择以下方案之一完成汤姆河上的克拉皮文斯卡娅HPP建设:零方案(拒绝完成),拒绝完成并清算未完成的建设对象,完成1976年项目参数的方案和基于基础技术解决方案开发结果的方案。考虑在该地区目前的社会经济条件下完成克拉皮文斯卡娅水电站建设的可能性的倡议,不仅将成为研究该地区发展前景的重要动力,而且还将确定从根本上改善自然地表水状况和人口生活条件的优先事项。然而,水力发电厂的设计是一个需要对其影响范围内的物体进行全面评估的过程。其中一些对象是被淹没的房地产对象。在研究过程中,在1977年波罗的海海拔系统中,对洪水区内的房地产对象(地块和基本建设项目)在海拔175.0米和177.5米的地方进行了计算。本文介绍了将被淹房地产地籍价值评估的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Methodology for estimating the cadastral value of real estate objects when creating the Krapivinsky reservoir
The authorities of Kuzbass drew attention to the objects of the Krapivinsky hydroelectric complex in 2019 that is 30 years after the suspension of construction. It was decided to assess the environmental impact and choose one of the following options for completing the construction of the Krapivinskaya HPP on the Tom River: zero option (refusal of completion), refusal of completion with liquidation of unfinished construction objects, option of completion to the project parameters of 1976 and option based on the results of basic technical solutions development in 2021. The initiative to consider the possibility of completing for the Krapivinskaya HPP construction in the current socio-economic conditions prevailing in the region will not only become an important incentive to study the prospects for the development of the region, but will also determine the priorities for radically improving the state of natural surface waters and living conditions of the population. However, the design of a hydroelectric power plant is a process that requires a comprehensive assessment of objects that will be in the zone of its influence. Some of those objects are flooded real estate objects. In the course of the study, calculations for real estate objects (land plots and capital construction projects) that will be in the flood zone are presented at elevations of 175.0 m and 177.5 m above sea level in the Baltic Elevation System of 1977. This work presents the results of cadastral value assessment for the real estate that will be flooded.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信