多区域电力市场的安全约束单元承诺

R. Chhetri, B. Venkatesh, E. Hill
{"title":"多区域电力市场的安全约束单元承诺","authors":"R. Chhetri, B. Venkatesh, E. Hill","doi":"10.1109/LESCPE.2006.280358","DOIUrl":null,"url":null,"abstract":"This paper presents a method for minimizing the energy supply cost of an electricity market with multiple regions interconnected by tie lines. It optimally commits the least number of generating units through a security constrained unit commitment procedure. After deregulation of electric utilities, electricity markets have been established. The generation corporation now quote price of power in terms of a revised pricing scheme. The independent system operator is some cases (multi-region) has to act as a regional operator. The proposed method that accommodates these new features is based on a mixed integer quadratic programming solution technique that is fast and reliable. An analysis on the relation between the amount of money saved by a coordinated SCUC of the multi-regional electricity market and the inter-regional tie line flow capacities has been performed and reported","PeriodicalId":225654,"journal":{"name":"2006 Large Engineering Systems Conference on Power Engineering","volume":"111 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Security Constraints Unit Commitment for a Multi-Regional Electricity Market\",\"authors\":\"R. Chhetri, B. Venkatesh, E. Hill\",\"doi\":\"10.1109/LESCPE.2006.280358\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a method for minimizing the energy supply cost of an electricity market with multiple regions interconnected by tie lines. It optimally commits the least number of generating units through a security constrained unit commitment procedure. After deregulation of electric utilities, electricity markets have been established. The generation corporation now quote price of power in terms of a revised pricing scheme. The independent system operator is some cases (multi-region) has to act as a regional operator. The proposed method that accommodates these new features is based on a mixed integer quadratic programming solution technique that is fast and reliable. An analysis on the relation between the amount of money saved by a coordinated SCUC of the multi-regional electricity market and the inter-regional tie line flow capacities has been performed and reported\",\"PeriodicalId\":225654,\"journal\":{\"name\":\"2006 Large Engineering Systems Conference on Power Engineering\",\"volume\":\"111 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-07-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 Large Engineering Systems Conference on Power Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/LESCPE.2006.280358\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 Large Engineering Systems Conference on Power Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/LESCPE.2006.280358","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

本文提出了一种多区域并网电力市场能源供应成本最小化的方法。通过安全约束的机组提交过程,优化提交最少数量的发电机组。在解除对电力公司的管制后,电力市场已经建立起来。发电公司现在根据修订后的定价方案报价。独立系统操作员在某些情况下(多区域)不得不充当区域操作员。该方法基于混合整数二次规划求解技术,具有快速、可靠的特点。对多区域电力市场协调scc节省的资金与区域间配电网流量之间的关系进行了分析
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Security Constraints Unit Commitment for a Multi-Regional Electricity Market
This paper presents a method for minimizing the energy supply cost of an electricity market with multiple regions interconnected by tie lines. It optimally commits the least number of generating units through a security constrained unit commitment procedure. After deregulation of electric utilities, electricity markets have been established. The generation corporation now quote price of power in terms of a revised pricing scheme. The independent system operator is some cases (multi-region) has to act as a regional operator. The proposed method that accommodates these new features is based on a mixed integer quadratic programming solution technique that is fast and reliable. An analysis on the relation between the amount of money saved by a coordinated SCUC of the multi-regional electricity market and the inter-regional tie line flow capacities has been performed and reported
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信