{"title":"独立工程师在加拿大大跨度桥梁设计和施工中的作用","authors":"S. Albhaisi","doi":"10.2749/istanbul.2023.1017","DOIUrl":null,"url":null,"abstract":"This paper describes the role of Independent Engineer (IE) in the design and construction of the newly constructed New Bridge over the Saint Lawrence (NBSL) River, also known as the New Champlain Bridge, in Montreal, Canada. The $3.2B Public-Private Partnership (P3) project includes a 2.1 mile long new bridge with a 790-foot cable-stayed main span. It also includes 19 bridge overpasses, and more than 3 miles of highway improvements. The new bridge has two three-lane corridors for vehicular traffic and a two-lane light rail transit system, as well as a multi-use path for pedestrians and cyclists. This new bridge has a 125-year design life and was open to highway traffic in both directions on July 1, 2019. The construction is ongoing on the bridge to install the light rail transit system which is expected to open in the spring of 2023. Various monitoring mechanisms have been set out to ensure that the Private Partner delivers the project in compliance with stipulated performance criteria. The Stantec and Ramboll team was selected by the Private Partner and the Government of Canada to be the Independent Engineer, whose mandate involves, examining, at various stages, the design documents, supervision plans and the management and quality control system provided by the Private Partner (PP), performing design reviews at various stages of the design, monitoring all work for the purpose of compliance with the Project Agreement (PA), and issuing certification of the completion of the work at Substantial and Final completion stages","PeriodicalId":237396,"journal":{"name":"IABSE Symposium, Istanbul 2023: Long Span Bridges","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Role of Independent Engineer in the Design and Construction of Long Span Bridges in Canada\",\"authors\":\"S. Albhaisi\",\"doi\":\"10.2749/istanbul.2023.1017\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes the role of Independent Engineer (IE) in the design and construction of the newly constructed New Bridge over the Saint Lawrence (NBSL) River, also known as the New Champlain Bridge, in Montreal, Canada. The $3.2B Public-Private Partnership (P3) project includes a 2.1 mile long new bridge with a 790-foot cable-stayed main span. It also includes 19 bridge overpasses, and more than 3 miles of highway improvements. The new bridge has two three-lane corridors for vehicular traffic and a two-lane light rail transit system, as well as a multi-use path for pedestrians and cyclists. This new bridge has a 125-year design life and was open to highway traffic in both directions on July 1, 2019. The construction is ongoing on the bridge to install the light rail transit system which is expected to open in the spring of 2023. Various monitoring mechanisms have been set out to ensure that the Private Partner delivers the project in compliance with stipulated performance criteria. The Stantec and Ramboll team was selected by the Private Partner and the Government of Canada to be the Independent Engineer, whose mandate involves, examining, at various stages, the design documents, supervision plans and the management and quality control system provided by the Private Partner (PP), performing design reviews at various stages of the design, monitoring all work for the purpose of compliance with the Project Agreement (PA), and issuing certification of the completion of the work at Substantial and Final completion stages\",\"PeriodicalId\":237396,\"journal\":{\"name\":\"IABSE Symposium, Istanbul 2023: Long Span Bridges\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IABSE Symposium, Istanbul 2023: Long Span Bridges\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2749/istanbul.2023.1017\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Symposium, Istanbul 2023: Long Span Bridges","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/istanbul.2023.1017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文描述了独立工程师(IE)在加拿大蒙特利尔新建的圣劳伦斯河(NBSL)新桥(也称为新尚普兰桥)的设计和施工中的作用。这个耗资32亿美元的公私合作(P3)项目包括一座长2.1英里、主跨790英尺的斜拉桥。它还包括19座立交桥和超过3英里的高速公路改善。新桥有两条三车道的车辆通道和一条两车道的轻轨交通系统,以及一条行人和骑自行车的多用途通道。这座新桥的设计寿命为125年,并于2019年7月1日向双向公路交通开放。桥上的建设正在进行,以安装轻轨交通系统,预计将于2023年春季开放。政府已设立多项监察机制,以确保私营合作伙伴按照规定的表现准则交付工程项目。Stantec和Ramboll团队被私人合作伙伴和加拿大政府选为独立工程师,其任务包括在各个阶段检查私人合作伙伴(PP)提供的设计文件、监督计划以及管理和质量控制系统,在设计的各个阶段进行设计审查,监督所有工作以遵守项目协议(PA)。并在实质性和最终完成阶段发出工程完成证书
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Role of Independent Engineer in the Design and Construction of Long Span Bridges in Canada
This paper describes the role of Independent Engineer (IE) in the design and construction of the newly constructed New Bridge over the Saint Lawrence (NBSL) River, also known as the New Champlain Bridge, in Montreal, Canada. The $3.2B Public-Private Partnership (P3) project includes a 2.1 mile long new bridge with a 790-foot cable-stayed main span. It also includes 19 bridge overpasses, and more than 3 miles of highway improvements. The new bridge has two three-lane corridors for vehicular traffic and a two-lane light rail transit system, as well as a multi-use path for pedestrians and cyclists. This new bridge has a 125-year design life and was open to highway traffic in both directions on July 1, 2019. The construction is ongoing on the bridge to install the light rail transit system which is expected to open in the spring of 2023. Various monitoring mechanisms have been set out to ensure that the Private Partner delivers the project in compliance with stipulated performance criteria. The Stantec and Ramboll team was selected by the Private Partner and the Government of Canada to be the Independent Engineer, whose mandate involves, examining, at various stages, the design documents, supervision plans and the management and quality control system provided by the Private Partner (PP), performing design reviews at various stages of the design, monitoring all work for the purpose of compliance with the Project Agreement (PA), and issuing certification of the completion of the work at Substantial and Final completion stages
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信