基于节点输送边际率准则的输电系统扩容规划

Jeonje Park, Wu Liang, Jaeseok Choi, A. El-Keib, Mohammad Shahidehpour
{"title":"基于节点输送边际率准则的输电系统扩容规划","authors":"Jeonje Park, Wu Liang, Jaeseok Choi, A. El-Keib, Mohammad Shahidehpour","doi":"10.1109/TD-ASIA.2009.5356816","DOIUrl":null,"url":null,"abstract":"This paper proposes a method for choosing the best transmission system expansion plan(TSEP) using nodal/bus delivery marginal rate criterion (BMRk) defined newly in this paper. The objective method minimizes a total cost which is an investment budget for constructing new transmission lines subject to the BMRk which means a nodal deterministic reliability level requirement at specified load point. Test results on an existing 21-bus system are included in the paper. It demonstrated the suitability of the proposed method for solving the TSEPproblem in competitive electricity market environment.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Transmission system expansion planning by nodal delivery marginal rate criterion\",\"authors\":\"Jeonje Park, Wu Liang, Jaeseok Choi, A. El-Keib, Mohammad Shahidehpour\",\"doi\":\"10.1109/TD-ASIA.2009.5356816\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper proposes a method for choosing the best transmission system expansion plan(TSEP) using nodal/bus delivery marginal rate criterion (BMRk) defined newly in this paper. The objective method minimizes a total cost which is an investment budget for constructing new transmission lines subject to the BMRk which means a nodal deterministic reliability level requirement at specified load point. Test results on an existing 21-bus system are included in the paper. It demonstrated the suitability of the proposed method for solving the TSEPproblem in competitive electricity market environment.\",\"PeriodicalId\":131589,\"journal\":{\"name\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TD-ASIA.2009.5356816\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356816","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文提出了一种利用新定义的节点/总线传输边际率准则(BMRk)选择最佳传输系统扩展计划(TSEP)的方法。目标方法使总成本最小化,总成本是新建输电线路的投资预算,该投资预算符合BMRk,即在特定负载点上的节点确定性可靠性水平要求。本文给出了现有21总线系统的测试结果。验证了该方法在电力市场竞争环境下解决tsep问题的适用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Transmission system expansion planning by nodal delivery marginal rate criterion
This paper proposes a method for choosing the best transmission system expansion plan(TSEP) using nodal/bus delivery marginal rate criterion (BMRk) defined newly in this paper. The objective method minimizes a total cost which is an investment budget for constructing new transmission lines subject to the BMRk which means a nodal deterministic reliability level requirement at specified load point. Test results on an existing 21-bus system are included in the paper. It demonstrated the suitability of the proposed method for solving the TSEPproblem in competitive electricity market environment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信