由于水轮机流量的优化,使水电厂在没有蓄水量的情况下运行

J. M. Blanco-Barrero
{"title":"由于水轮机流量的优化,使水电厂在没有蓄水量的情况下运行","authors":"J. M. Blanco-Barrero","doi":"10.56845/rebs.v3i2.51","DOIUrl":null,"url":null,"abstract":"Hydroelectric power plants in diversion scheme systems utilize the water flowing through the river, since they present the necessary facilities and infrastructures to channel and harness the water, without having in their initial conception any storage systems. This type of power stations are designed and automated to operate between certain limits of water head, working with “constant head”, using the heads available at any moment. The operating limits are determined by the “nominal flow” for which the power plant has been designed and the “minimal technical flow” which corresponds to the minimum value of the flow with which the plant can work, which depends on each type of turbine.  By means of the presented optimization algorithms we can take advantage of those periods of time with low levels of flow (low water levels) to utilize the channels in the power station as storage elements of flow under the technical minimum, making the power plant undergo sequential cycles of emptying/filling of channels, allowing for the energetic exploitation, that will be denoted as “optimal flow”.In this article, we intend to determine how we can adapt each type of turbine to the new optimization algorithms proposed, establishing the increments in production obtained for each type of turbine and the possibility of applying the “optimal flow\" algorithms.","PeriodicalId":194964,"journal":{"name":"Renewable Energy, Biomass & Sustainability","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Operation of hydroelectric plants without storage volume due to optimization of the turbine flow\",\"authors\":\"J. M. Blanco-Barrero\",\"doi\":\"10.56845/rebs.v3i2.51\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Hydroelectric power plants in diversion scheme systems utilize the water flowing through the river, since they present the necessary facilities and infrastructures to channel and harness the water, without having in their initial conception any storage systems. This type of power stations are designed and automated to operate between certain limits of water head, working with “constant head”, using the heads available at any moment. The operating limits are determined by the “nominal flow” for which the power plant has been designed and the “minimal technical flow” which corresponds to the minimum value of the flow with which the plant can work, which depends on each type of turbine.  By means of the presented optimization algorithms we can take advantage of those periods of time with low levels of flow (low water levels) to utilize the channels in the power station as storage elements of flow under the technical minimum, making the power plant undergo sequential cycles of emptying/filling of channels, allowing for the energetic exploitation, that will be denoted as “optimal flow”.In this article, we intend to determine how we can adapt each type of turbine to the new optimization algorithms proposed, establishing the increments in production obtained for each type of turbine and the possibility of applying the “optimal flow\\\" algorithms.\",\"PeriodicalId\":194964,\"journal\":{\"name\":\"Renewable Energy, Biomass & Sustainability\",\"volume\":\"53 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Renewable Energy, Biomass & Sustainability\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56845/rebs.v3i2.51\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Renewable Energy, Biomass & Sustainability","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56845/rebs.v3i2.51","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

导流方案系统中的水力发电厂利用流经河流的水,因为它们提供了必要的设施和基础设施来引导和利用水,而在最初的概念中没有任何存储系统。这种类型的电站设计和自动化在一定的水头范围内运行,以“恒定水头”工作,随时使用可用的水头。运行限值由电厂设计时的“标称流量”和电厂可以工作的最小流量“最小技术流量”决定,这取决于每种类型的涡轮机。通过所提出的优化算法,我们可以利用低流量(低水位)的时间段,利用电站内的渠道作为技术最小流量的存储要素,使电厂经历连续的渠道排空/填充循环,允许能量开发,这将被称为“最优流量”。在本文中,我们打算确定如何使每种类型的涡轮机适应所提出的新的优化算法,确定每种类型的涡轮机获得的产量增量以及应用“最优流量”算法的可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Operation of hydroelectric plants without storage volume due to optimization of the turbine flow
Hydroelectric power plants in diversion scheme systems utilize the water flowing through the river, since they present the necessary facilities and infrastructures to channel and harness the water, without having in their initial conception any storage systems. This type of power stations are designed and automated to operate between certain limits of water head, working with “constant head”, using the heads available at any moment. The operating limits are determined by the “nominal flow” for which the power plant has been designed and the “minimal technical flow” which corresponds to the minimum value of the flow with which the plant can work, which depends on each type of turbine.  By means of the presented optimization algorithms we can take advantage of those periods of time with low levels of flow (low water levels) to utilize the channels in the power station as storage elements of flow under the technical minimum, making the power plant undergo sequential cycles of emptying/filling of channels, allowing for the energetic exploitation, that will be denoted as “optimal flow”.In this article, we intend to determine how we can adapt each type of turbine to the new optimization algorithms proposed, establishing the increments in production obtained for each type of turbine and the possibility of applying the “optimal flow" algorithms.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信