具有附加资源的不相关并行机调度问题综述

Munther H. Abed, Mohd Nizam Mohmad Kahar
{"title":"具有附加资源的不相关并行机调度问题综述","authors":"Munther H. Abed, Mohd Nizam Mohmad Kahar","doi":"10.52866/ijcsm.2023.02.02.020","DOIUrl":null,"url":null,"abstract":"This study deals with an unrelated parallel machine scheduling problem with additional resources (UPMR). That is one of the important sub-problems in the scheduling. UPMR consists of scheduling a set of jobs on unrelated machines. In addition to that, a number of one or more additional resources are needed. UPMR is very important and its importance comes from the wealth of applications; they are applicable to engineering and scientific situations and manufacturing systems such as industrial robots, nurses, machine operators, bus drivers, tools, assembly plant machines, fixtures, pallets, electricity, mechanics, dies, automated guided vehicles, fuel, and more. The importance also comes from the concern about the limitation of resources that are dedicated for the production process. Therefore, researchers and decision makers are still working on UPMR problem to get an optimum schedule for all instances which have not been obtained to this day. The optimum schedule is able to increase the profits and decrease the costs whilst satisfying the customers’ needs. This research aims to review and discuss studies related to unrelated parallel machines and additional resources. Overall, the review demonstrates the criticality of resolving the UPMR problem. Metaheuristic techniques exhibit significant effectiveness in generating results and surpassing other algorithms. Nevertheless, continued improvement is essential to satisfy the evolving requirements of UPMR, which are subject to operational changes based on customer demand.","PeriodicalId":158721,"journal":{"name":"Iraqi Journal for Computer Science and Mathematics","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Review on unrelated parallel machine scheduling problem with additional resources\",\"authors\":\"Munther H. Abed, Mohd Nizam Mohmad Kahar\",\"doi\":\"10.52866/ijcsm.2023.02.02.020\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study deals with an unrelated parallel machine scheduling problem with additional resources (UPMR). That is one of the important sub-problems in the scheduling. UPMR consists of scheduling a set of jobs on unrelated machines. In addition to that, a number of one or more additional resources are needed. UPMR is very important and its importance comes from the wealth of applications; they are applicable to engineering and scientific situations and manufacturing systems such as industrial robots, nurses, machine operators, bus drivers, tools, assembly plant machines, fixtures, pallets, electricity, mechanics, dies, automated guided vehicles, fuel, and more. The importance also comes from the concern about the limitation of resources that are dedicated for the production process. Therefore, researchers and decision makers are still working on UPMR problem to get an optimum schedule for all instances which have not been obtained to this day. The optimum schedule is able to increase the profits and decrease the costs whilst satisfying the customers’ needs. This research aims to review and discuss studies related to unrelated parallel machines and additional resources. Overall, the review demonstrates the criticality of resolving the UPMR problem. Metaheuristic techniques exhibit significant effectiveness in generating results and surpassing other algorithms. Nevertheless, continued improvement is essential to satisfy the evolving requirements of UPMR, which are subject to operational changes based on customer demand.\",\"PeriodicalId\":158721,\"journal\":{\"name\":\"Iraqi Journal for Computer Science and Mathematics\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Iraqi Journal for Computer Science and Mathematics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.52866/ijcsm.2023.02.02.020\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Iraqi Journal for Computer Science and Mathematics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52866/ijcsm.2023.02.02.020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文研究了一个不相关的具有附加资源的并行机器调度问题。这是调度中的重要子问题之一。UPMR包括在不相关的机器上调度一组作业。除此之外,还需要一种或多种额外的资源。UPMR是非常重要的,它的重要性来自于丰富的应用;它们适用于工程和科学情况以及制造系统,如工业机器人,护士,机器操作员,巴士司机,工具,装配厂机器,固定装置,托盘,电力,机械,模具,自动引导车辆,燃料等。其重要性还来自于对用于生产过程的资源有限的关注。因此,研究人员和决策者仍在研究UPMR问题,以获得所有实例的最优调度,但迄今尚未得到。在满足客户需求的前提下,优化生产进度,提高利润,降低成本。本研究旨在回顾和讨论与不相关的并行机相关的研究和额外的资源。总的来说,审查证明了解决UPMR问题的重要性。元启发式技术在生成结果和超越其他算法方面表现出显著的有效性。然而,持续的改进对于满足UPMR不断变化的需求是必不可少的,这些需求受制于基于客户需求的操作变更。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Review on unrelated parallel machine scheduling problem with additional resources
This study deals with an unrelated parallel machine scheduling problem with additional resources (UPMR). That is one of the important sub-problems in the scheduling. UPMR consists of scheduling a set of jobs on unrelated machines. In addition to that, a number of one or more additional resources are needed. UPMR is very important and its importance comes from the wealth of applications; they are applicable to engineering and scientific situations and manufacturing systems such as industrial robots, nurses, machine operators, bus drivers, tools, assembly plant machines, fixtures, pallets, electricity, mechanics, dies, automated guided vehicles, fuel, and more. The importance also comes from the concern about the limitation of resources that are dedicated for the production process. Therefore, researchers and decision makers are still working on UPMR problem to get an optimum schedule for all instances which have not been obtained to this day. The optimum schedule is able to increase the profits and decrease the costs whilst satisfying the customers’ needs. This research aims to review and discuss studies related to unrelated parallel machines and additional resources. Overall, the review demonstrates the criticality of resolving the UPMR problem. Metaheuristic techniques exhibit significant effectiveness in generating results and surpassing other algorithms. Nevertheless, continued improvement is essential to satisfy the evolving requirements of UPMR, which are subject to operational changes based on customer demand.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.30
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信