自动点焊装置原理图的研制

V. Chaban, N. A. Akafyeva
{"title":"自动点焊装置原理图的研制","authors":"V. Chaban, N. A. Akafyeva","doi":"10.1109/apede.2018.8542180","DOIUrl":null,"url":null,"abstract":"A schematic diagram of the automatic dot welding machine consisting of four blocks was offered: power; synchronization with network; managements; short circuit detecting. For development of the scheme of the device a free software of S-Plan is used. By means of Multisim software the operating modes of the transformer of the device power block has modelled. It is shown that in the operating microcontroller it is necessary to realize the program of synchronization with a phase of mains voltage that the transformer turned on only near transition of voltage of network through zero. At the exit of the block of synchronization we will receive a meandro-like signal, with short time of zero level.","PeriodicalId":311577,"journal":{"name":"2018 International Conference on Actual Problems of Electron Devices Engineering (APEDE)","volume":"104 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of the Schematic Diagram of the Automatic Dotted Welding Apparatus\",\"authors\":\"V. Chaban, N. A. Akafyeva\",\"doi\":\"10.1109/apede.2018.8542180\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A schematic diagram of the automatic dot welding machine consisting of four blocks was offered: power; synchronization with network; managements; short circuit detecting. For development of the scheme of the device a free software of S-Plan is used. By means of Multisim software the operating modes of the transformer of the device power block has modelled. It is shown that in the operating microcontroller it is necessary to realize the program of synchronization with a phase of mains voltage that the transformer turned on only near transition of voltage of network through zero. At the exit of the block of synchronization we will receive a meandro-like signal, with short time of zero level.\",\"PeriodicalId\":311577,\"journal\":{\"name\":\"2018 International Conference on Actual Problems of Electron Devices Engineering (APEDE)\",\"volume\":\"104 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 International Conference on Actual Problems of Electron Devices Engineering (APEDE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/apede.2018.8542180\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Conference on Actual Problems of Electron Devices Engineering (APEDE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/apede.2018.8542180","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

给出了由四部分组成的自动点焊机原理图:电源;与网络同步;管理层;短路检测。该装置的方案开发使用了免费的S-Plan软件。利用Multisim软件对设备电源模块变压器的工作模式进行了建模。结果表明,在操作单片机中,有必要实现变压器仅在电网电压过零过渡附近导通的市电电压相位同步程序。在同步块的出口,我们将接收到一个短时间的零电平的类meandroo信号。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development of the Schematic Diagram of the Automatic Dotted Welding Apparatus
A schematic diagram of the automatic dot welding machine consisting of four blocks was offered: power; synchronization with network; managements; short circuit detecting. For development of the scheme of the device a free software of S-Plan is used. By means of Multisim software the operating modes of the transformer of the device power block has modelled. It is shown that in the operating microcontroller it is necessary to realize the program of synchronization with a phase of mains voltage that the transformer turned on only near transition of voltage of network through zero. At the exit of the block of synchronization we will receive a meandro-like signal, with short time of zero level.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信