S.B. Choi, K. Nam, S.H. Jeong, D.K. Kim, J.D. Lee, H. Rhoo
{"title":"韩国公共客户中断费用的评价","authors":"S.B. Choi, K. Nam, S.H. Jeong, D.K. Kim, J.D. Lee, H. Rhoo","doi":"10.1109/TDC.2006.1668592","DOIUrl":null,"url":null,"abstract":"This paper presents evaluation of the interruption costs for general public customer in Korea with customer survey methodology. When various research results are examined, evaluation of direct interruption cost is much more simple. Especially, in the case of general public customers, it is known that the evaluation of direct interruption cost is more useful. Accordingly, this paper selected the customer survey method to evaluate the interruption cost for general public customer in Korea considering interruption and customer characteristic","PeriodicalId":123024,"journal":{"name":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluation of Interruption Costs for General Public Customer in Korea\",\"authors\":\"S.B. Choi, K. Nam, S.H. Jeong, D.K. Kim, J.D. Lee, H. Rhoo\",\"doi\":\"10.1109/TDC.2006.1668592\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents evaluation of the interruption costs for general public customer in Korea with customer survey methodology. When various research results are examined, evaluation of direct interruption cost is much more simple. Especially, in the case of general public customers, it is known that the evaluation of direct interruption cost is more useful. Accordingly, this paper selected the customer survey method to evaluate the interruption cost for general public customer in Korea considering interruption and customer characteristic\",\"PeriodicalId\":123024,\"journal\":{\"name\":\"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition\",\"volume\":\"38 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2006.1668592\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2006.1668592","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Evaluation of Interruption Costs for General Public Customer in Korea
This paper presents evaluation of the interruption costs for general public customer in Korea with customer survey methodology. When various research results are examined, evaluation of direct interruption cost is much more simple. Especially, in the case of general public customers, it is known that the evaluation of direct interruption cost is more useful. Accordingly, this paper selected the customer survey method to evaluate the interruption cost for general public customer in Korea considering interruption and customer characteristic