{"title":"用于复杂制造环境的基于知识的调度程序","authors":"U. Canzi, G. Guida, W. Poloni, S. Pozzi","doi":"10.1109/DKSME.1989.107444","DOIUrl":null,"url":null,"abstract":"The authors describe CRONOS-II, a knowledge-based scheduler that can model both technological and temporal constraints needed to represent realistic production plans. This scheduler is able to decompose the execution of elementary tasks into parts. Furthermore, it offers the possibility to control the global quality of the produced schedules. From the technical point of view, it implements a depth-first heuristic-guided search joined to an original failure-driven backtracking mechanism.<<ETX>>","PeriodicalId":228213,"journal":{"name":"Proceedings. Second International Conference on Data and Knowledge Systems for Manufacturing and Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1989-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"CRONOS-II: a knowledge-based scheduler for complex manufacturing environments\",\"authors\":\"U. Canzi, G. Guida, W. Poloni, S. Pozzi\",\"doi\":\"10.1109/DKSME.1989.107444\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The authors describe CRONOS-II, a knowledge-based scheduler that can model both technological and temporal constraints needed to represent realistic production plans. This scheduler is able to decompose the execution of elementary tasks into parts. Furthermore, it offers the possibility to control the global quality of the produced schedules. From the technical point of view, it implements a depth-first heuristic-guided search joined to an original failure-driven backtracking mechanism.<<ETX>>\",\"PeriodicalId\":228213,\"journal\":{\"name\":\"Proceedings. Second International Conference on Data and Knowledge Systems for Manufacturing and Engineering\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1989-10-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings. Second International Conference on Data and Knowledge Systems for Manufacturing and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DKSME.1989.107444\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. Second International Conference on Data and Knowledge Systems for Manufacturing and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DKSME.1989.107444","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
CRONOS-II: a knowledge-based scheduler for complex manufacturing environments
The authors describe CRONOS-II, a knowledge-based scheduler that can model both technological and temporal constraints needed to represent realistic production plans. This scheduler is able to decompose the execution of elementary tasks into parts. Furthermore, it offers the possibility to control the global quality of the produced schedules. From the technical point of view, it implements a depth-first heuristic-guided search joined to an original failure-driven backtracking mechanism.<>